Colgate Penstock Hillslope Erosion and Temporary Stabilization
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-007
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from yubawater.bonfirehub.com. Updated .
About this opportunity
Yuba Water Agency is accepting bids for temporary stabilization and erosion control work at the Colgate Penstock site following the February 13, 2026 rupture, with bids due August 18, 2026 under IFB REF # 2026-005 (rebid).
The scope includes localized grading and earthwork, installation of temporary erosion and sediment control Best Management Practices, placement of temporary slope stabilization materials, construction of a large rock buttress, drainage and runoff management repairs, revegetation and site stabilization treatments, access improvements to support construction and monitoring, and environmental protection measures. The work may require specialized construction equipment to access and traverse steep slopes. This project does not include penstock reconstruction; activities focus on minimizing slope degradation, sediment discharge, and environmental resource impacts while long-term repair and restoration plans are developed.
This is a rebid. Addendum 1 from the prior solicitation is incorporated as Exhibit J (Frequently Asked Questions). Addendum 2 is no longer relevant. Addendum 3 from the prior bid is incorporated as new drawings and technical specifications with no changes since release. Section 01305, 1.04 A.1. has been updated in this rebid. Exhibit B has been removed as not relevant.
The project is located in Yuba County, California.
Opportunity text
Yuba Water Agency is accepting Invitations for Bid for work consisting of construction of temporary stabilization and erosion control measures to address conditions created by the Penstock rupture that occurred on February 13, 2026. The project intends to minimize the potential for additional slope degradation, sediment discharge, and impacts to environmental resources while long-term repair and restoration plans are developed and evaluated. This project does not include the reconstruction of the penstock. Proposed activities include localized grading and earthwork; installation of temporary erosion and sediment control Best Management Practices (BMPs); placement of temporary slope stabilization materials; construction of a large rock buttress; drainage and runoff management repairs; revegetation and site stabilization treatments; access improvements as necessary to support construction and monitoring activities; and implementation of environmental protection measures. The work may require the use of specialized construction equipment to access and traverse steep slopes. Changes from prior bid REF # 2026-005 1. Addendum 1 from prior bid is incorporated as Exhibit J Frequently Asked Questions. 2. Addendum 2 is no longer relevant. 3. Addendum 3 from prior bid is incorporated as new drawings and technical specifications and no changes have been made to either document since released. 4. Section 01305, 1.04 A.1. has been updated. 5. Exhibit B removed not relevant to this rebid.