CMP lining project-multiple locations

Awarded State & local contract opportunity Posted

Solicitation number
22-240-J
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Roswell, Georgia is requesting bids from pre-qualified stormwater lining construction contractors for cleaning and lining of stormwater pipe at five locations throughout the city (Martin Road at Cedar Knoll Drive, 11885 Mountain Laurel Drive, 89 Nancy Trail, 335 Spindle Tree Trace, and 110 Woodstock Street) under ITB with bids due September 15, 2022. This is a locally funded project restricted to contractors on the City's pre-qualified stormwater lining construction contractor roster.

The scope encompasses stormwater pipe cleaning and lining at each of the five designated locations per plans and specifications posted to the project site. The successful contractor is responsible for all signage, Traffic Control Plan preparation, and Right of Way Permit acquisition where required. The City will issue required permits at no charge; no permits have been obtained prior to solicitation. Thirty calendar days have been allotted for construction performance at each location.

A 5% Bid Bond must accompany all bids. The successful contractor must provide 100% Payment and Performance Bonds. ITB documents are available free of charge for download and electronic submission through the City of Roswell website at https://roswellgov.bonfirehub.com. No pre-bid meetings are planned. The City reserves the right to reject any or all bids. For document access or submission issues, contact the City of Roswell Purchasing Division at 770-641-3718.

Opportunity text

The City of Roswell, Georgia ("the City"), is requesting offers from City of Roswell pre-qualified Stormwater Lining construction contractors for the cleaning and lining of Stormwater pipe located throughout the city at multiple locations. Each project is described in the Plans and Specifications Posted to the Project Site. Contractor will be responsible for all signage. A Traffic Control Plan and Right of Way Permit (if required) will be required to be obtained by the successful contractor. There will be no charge for any City Issued required permits. No permits have been obtained. No Pre-Bids are planned. The City may reject any one or all bids. Project locations: Martin Rd. @ Cedar Knoll Dr. 11885 Mountain Laurel Dr. 89 Nancy Trl. 335 Spindle Tree Trace 110 Woodstock St. This is a Locally Funded project. ITB documents may be obtained for free and must be submitted electronically at no charge from the City of Roswell website at https://roswellgov.bonfirehub.com. If you encounter problems accessing or submitting the documents, contact City of Roswell Purchasing Division at 770-641-3718 and refer to ITB name and number. Thirty (30) calendar days have been allotted for performance of construction for each location. A 5% Bid Bond is required to be submitted with the bid and 100% Payment and Performance bonds will be required by the successful contractor.