CM at risk RFP for Reroof, HVAC, Kitchen upgrade at Mt. Yonah Elementary
Awarded State & local contract opportunity Posted
- Solicitation number
- PE-75410-NONST-2024-000000001
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 30103606 Wood trusses
- 30122000 Specialized external flooring and paving materials
- 30122001 Elastic sheet exterior paving material
- 30122002 Exterior permeable aggregate flooring material
- 30122003 Painted or coated exterior flooring
- 30122004 Non skid exterior paving material
- 30161722 Stoneplastic composite flooring
- 72151200 Heating and cooling and air conditioning HVAC construction and maintenance services
- 72151003 Heating system maintenance and repair service
- 72151004 Hydronics heating system maintenance and repair service
Show all 17
- 72151201 HVAC mechanical construction service
- 72151202 HVAC process piping construction service
- 72151203 HVAC solar energy construction service
- 72151204 HVAC ventilation and duct work construction service
- 72151205 HVAC refrigeration construction service
- 72151206 HVAC heating system construction service
- 72152904 Exterior metal wall system installation service
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
This state and local contracting opportunity is a Request for Proposal (RFP) issued by the White County School District in Georgia to solicit proposals from Construction Manager at Risk (CM at Risk) firms for renovations and upgrades to Mount Yonah Elementary School. The project includes a re-roof, HVAC system upgrades, and kitchen upgrades, with a preliminary stated cost limitation of $3.5 million. The selected CM at Risk firm will work collaboratively with the Owner and design professionals to provide preconstruction and construction services. Key requirements include demonstrating firm stability, relevant experience, qualified project team, and a comprehensive management plan. Proposals are due on October 30, 2023, and the selection of the CM at Risk firm is anticipated to be finalized on November 16, 2023, with preconstruction services beginning immediately and construction services commencing upon contract execution. The work is expected to be completed by August 2, 2024.
The RFP does not specify any set-aside designations or restrictions on the types of organizations that can respond. The contract will be an Actual Cost plus a Fixed or percentage Fee not to exceed the Guaranteed Maximum Price (GMP) Agreement, but the RFP does not provide any details on the potential award value or budget range for this project.
Opportunity text
CM at Risk for a REroof, HVAC, and Kitchen upgrade at Mount Yonah Elementary School in the White County Georgia School District
Files
| File | Type | Posted |
|---|---|---|
| Request for Proposal (CP) RFP _ Mt_ Yonah Ele.pdf | ||
| Charles Black Bid Package _ Awarded.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity