Clear Creek Trail Erosion Analysis & Design
Closed State & local contract opportunity
- Solicitation number
- RFP-25-019
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90604 Agricultural Development - Architectural Services
- 90629 Environmental - Architectural
- 92535 Environmental Engineering
- 92545 Geological Engineering
- 92558 Irrigation; Drainage; Flood Control/Engineering
- 98814 Erosion Control Services
- 98852 Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services)
- UNSPSC codes
- 70171803 Flood protection or control services
- 70111500 Plants and ornamental trees
- 70111601 Planting services
- 70131602 Lime spreading services
- 70131604 Seed bed preparation services
- 70131605 Soil chemical treatment services
- 72102902 Landscaping services
- 72102905 Exterior grounds maintenance
- 72154002 Artificial turf installation service
- 70131502 Soil conservation or protection services
Show all 23
- 70131600 Land and soil preparation
- 70111704 Horticultural counseling services
- 70131503 Erosion control services
- 70111600 Flowering plants
- 70111711 Sprigging services
- 70111603 Floriculture services
- 70171800 Drainage services
- 70130000 Land and soil preparation and management and protection
- 70111501 Planting services or ornamental plant or bush or tree
- 70111602 Nursery services
- 70111703 Garden planting or maintenance services
- 70111709 Seeding services
- 70131601 Fertilizer application services
- Point of contact
-
- Whitney Mugford-Smith wmsmith@ci.wheatridge.co.us (303) 235-2811
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Wheat Ridge, Colorado is seeking a qualified firm to conduct a comprehensive erosion analysis and design project for the Clear Creek Trail, located west of Youngfield Street. The procurement is structured as a Request for Proposals (RFP-25-019) utilizing a best value procurement model, which allows selection based on qualifications, price, capabilities, and alignment with city policies. The primary deliverables include a current state erosion analysis, landscape improvement design, comprehensive survey, geotechnical assessment, 100% bid-ready construction drawings, traffic control planning, construction signage, stakeholder coordination, and floodplain permit acquisition. Proposers will be evaluated across five key criteria: firm capabilities and references (20%), scope of submission (20%), effective approach and timeline (20%), plan effectiveness (20%), and price/total cost of ownership (20%). Critical dates include a mandatory pre-proposal meeting on April 3, 2025, at 11:00am, with proposals due by April 25, 2025, at 2:00pm, and an anticipated contract date of May 14, 2025. The project term will extend until project completion, with actual trail construction planned for a future phase.
The City demonstrates a commitment to inclusive procurement by encouraging participation from disadvantaged business enterprises (DBEs) and maintaining a tax-exempt status. While no specific budget range is explicitly stated in the documentation, the procurement process suggests flexibility in vendor selection based on comprehensive qualifications and proposed approaches. No incumbent vendors are mentioned, and the project appears to be a new initiative for trail infrastructure improvement. The procurement is open to firms capable of delivering a holistic design solution that addresses trail erosion, safety improvements, and complex environmental considerations including steep slopes adjacent to a pond and Clear Creek. Proposers must submit comprehensive documentation, including references, team qualifications, project management details, and various affidavits confirming compliance with local, state, and federal regulations. The City's evaluation will prioritize firms demonstrating technical expertise, innovative design approaches, and the ability to effectively coordinate with multiple stakeholders throughout the project lifecycle.
Opportunity text
The City is seeking a qualified firm to analyze the current state of the erosion area and provide a recommended design to mitigate the erosion and improve safety for trail users. Constructing the recommended design will take place in a future phase. Term shall be for Till Completion.
The City has never contracted for these services.
Files
| File | Type | Posted |
|---|---|---|
| Clear_Creek_Trail_Erosion_Analysis_&_Design.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity