Clean Coast Texas Collaborative: Green Infrastructure Project
Closed State & local contract opportunity
- Solicitation number
- 754-TXST-2025-RFP-393-MEADCTR
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90629 Environmental - Architectural
- 91223 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, Etc.)
- 91227 Construction, Irrigation System
- 91356 Construction, Utility/Underground Projects
- 91360 Construction, Water System/Plants, Main And Service Line
- 91484 Trade Services, Construction (Not Otherwise Classified)
- 91843 Environmental Consulting
- 92535 Environmental Engineering
- 92629 Contaminated Groundwater Services (Including Discharge Pipe Installation)
- 92684 Soil Pollution Services
- Point of contact
-
- Dan Alden danalden@txstate.edu (512) 245-2521
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
Texas State University is seeking competitive proposals for the Clean Coast Texas Collaborative Green Infrastructure Project through solicitation #754-TXST-2025-RFP-393-MEADCTR, specifically targeting construction services for a rain garden installation in Robstown, Texas. The project encompasses several critical construction elements, including comprehensive excavation of existing lawn areas, installation of an underdrain system with direct stormwater drain connectivity, concrete driveway work, filtration media installation, and procurement and placement of native plants according to precise design specifications. Proposals must be submitted through the university's online procurement portal at bids.sciquest.com by January 10, 2025, at 12:00 PM Central Standard Time. The solicitation appears to require detailed technical capabilities in green infrastructure construction, with specific expertise in rain garden design, stormwater management, and native landscaping. While specific evaluation criteria are not explicitly detailed in the provided documents, the project's technical complexity suggests that bidders will likely be assessed on their demonstrated experience, technical approach, and ability to execute the specialized infrastructure project.
No explicit set-aside designations or specific restrictions on respondent organizations are mentioned in the available documentation. The solicitation does not indicate preferences for disadvantaged business enterprises or provide information about incumbent vendors. Similarly, no specific budget range or award value is disclosed in the procurement documents. The project appears to be part of a broader Clean Coast Texas Collaborative initiative, potentially indicating potential environmental or sustainability funding sources, though no explicit funding mechanisms are outlined. A local nursery has confirmed availability of the required native plants, which may suggest potential local partnership opportunities or supply chain considerations for potential bidders. The project is located in Trinity County and is associated with Texas State University, which is celebrating its 125th anniversary, potentially indicating an institutional commitment to sustainable infrastructure development.
Files
| File | Type | Posted |
|---|---|---|
| ESBD_386795_1734627798264_ESBD Posting 12.13.24.pdf | ||
| ESBD_386795_1734627798264_ESBD Posting 12.13.24.pdf |