The City of Social Circle, Georgia is requesting bids on two major wastewater infrastructure contracts with proposals due September 17, 2026. Contract 1 covers sewerage system improvements; Contract 2 covers construction of the Little River Water Pollution Control Plant.

Contract 1 requires installation of approximately 3,600 linear feet of ductile iron pipe (DIP) and polyvinyl chloride (PVC) sewer lines with manholes, jack and bore operations, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Construction time is 270 consecutive calendar days.

Contract 2 encompasses a complete wastewater treatment facility including a screen and grit structure, two aeration basins, two final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester, and sludge dewatering building with all necessary appurtenances. Initial construction is allocated 480 consecutive calendar days with 540 days allotted for final completion. The phased schedule permits sewerage system completion prior to or concurrent with treatment plant construction.

The attached specification document (2790_001.pdf, 63 KB) contains detailed site conditions, design specifications, construction methodology, materials, equipment, environmental controls, and quality assurance standards. No estimated contract value, incumbent contractor, set-aside or preference program, pre-bid meeting date, or question deadline is identified in the source materials.

Opportunity text

Contract 1: Sewerage System Improvements installing approximately 3,600 linear feet of DIP and PVC sewer including manholes, jack and bore, rock excavation, clearing, soil erosion and sediment control, and appurtenances. Time allotted for construction 270 consecutive calendar days. Contract 2: Little River Water Pollution Control Plant to include a screen and grit structure, (2) two aeration basins, two (2) final clarifiers, tertiary filters, ultraviolet disinfection unit, sludge pump station, plant pump station, chemical feed facilities, control building, digester and sludge dewatering building, all complete with appurtenances. Time allotted for construction is 480 consecutive calendar days and 540 days for final completion.

Files

File Type Posted
2790_001.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors