City of Griffin Meter Connections Division I Bottoms Road & Division II Flat Shoals Road
Open State & local contract opportunity Posted
- Solicitation number
- PE-33955-NONST-2027-000000005
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141126 Underground utilities construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 41112504 Water meters
- 81141508 Meter proving production test
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- Point of contact
-
- Shon Hampton shon@watkinseng.com (229) 388-8823
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Pike County Water & Sewerage Authority is requesting sealed bids for construction of meter connections to the City of Griffin transmission line across two divisions (Bottoms Road and Division II Flat Shoals Road), with bids due November 13, 2026 at 11:00 a.m. at 7818 US-19 South, Zebulon, Georgia. All bidders must hold a Georgia-licensed utility contractor license with the license number displayed on the bid envelope — this is a gatekeeping requirement. The Authority may award one or both divisions under a single contract.
Division I includes metered connection with pressure-reducing valve, meter, and double detector check valve assembly in two vaults, yard piping, valves, jack and bore steel casing, and all associated work. Division II includes the same metered connection components and assemblies without jack and bore casing. Substantial completion is required within 90 consecutive calendar days; full contract close-out within 104 consecutive calendar days.
Work will be funded by ARPA Grant Funds and Local Funds. All contractors and subcontractors must register and participate in E-Verify under the Georgia Security and Immigration Compliance Act.
Bid security requires a Bid Bond or certified cashier's check of not less than 10% of the bid amount, with surety companies rated "A" minimum and financial strength of at least five times the contract price. The successful bidder must furnish Performance and Payment Bonds each in the amount of 100% of the contract amount. Prequalification of bidders may be required prior to contract award.
Bidding documents are available from Watkins & Associates, LLC (Office of the Engineer), 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823, for a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) per set. Bids remain binding for 60 days following closing. Additional information and addenda are posted at www.watkinseng.com.
Opportunity text
Sealed Bids for the construction of the City of Griffin Meter Connections Division I Bottoms Road & Division II Flat Shoals Road will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until Friday, November 13, 2026, at 11:00 A.M. local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed City of Griffin Meter Connections Division I Bottoms Road & Division II Flat Shoals Road as shown on the construction drawings. In general, construction consists of Division I - Metered Connection to the City of Griffin Transmission line complete with Pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, Jack & bore steel casing and all associated measures for the complete project. Division II - Metered Connection to the City of Griffin Transmission line complete with Pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, and all associated measures for a complete project. Time allotted for completion of work is 90 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 104 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. The Authority may award one or both Division. Copies of the Bidding Documents may be obtained from Watkins & Associates, LLC, 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823 (Office of the Engineer), upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) for each set.
Files
| File | Type | Posted |
|---|---|---|
| 00111 _ Meter Connections Advertisement for B.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity