City of Alma - Teresa Estates - A Rural Workforce Housing Initiative Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-60350-NONST-2025-000000006
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 34060 Hydrants, Fire (Including Accessories And Parts)
- 76569 Sprinkler Equipment (For Roads And Streets)
- 90692 Utilities (Gas, Steam, Electric) - Architectural
- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 91117 C.i.p., Construction, Roads
- 91164 C.i.p., Utilities
- 91371 Maintenance And Repair, Highway And Road (To Include The Removal Of Asphalt, Concrete, Bitumens, Etc)
- 93633 Fire Protection Equipment And Systems Including Fire Hydrants, Fire Sprinkler Systems, Smoke Detectors, Jaws Of Life, Fire Protection Material Treatment, Firestop And Fire Barriers, Etc.inspection, Maintenance And Repair
- UNSPSC codes
- 72101509 Fire protection system and equipment maintenance or repair service
- 73151702 Fire protection material treatment services
- 46171647 Flammable vapour detector
- 72101516 Fire extinguisher inspection maintenance and repair service
- 72151103 Irrigation sprinkler system installation service
- 40141726 Hydrants
- 72141003 Highway and road maintenance service
- 73151502 Joint sealing services
- 72151102 Fire sprinkler system installation service
- Point of contact
-
- Rusty Lovett rulovett@robertscivilengineering.com (912) 278-1947
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Alma in Bacon County, Georgia, is soliciting competitive bids for the Teresa Estates Rural Workforce Housing Initiative Project, an infrastructure development opportunity involving comprehensive utility and roadway construction. The procurement is an Invitation for Bid (IFB No. 2501) seeking a contractor to install approximately 3,300 linear feet of 8-inch water main with hydrants and meters, 3,041 linear feet of 8-inch sanitary sewer main with manholes and service laterals, stormwater utilities including 8,400 linear feet of rollover curb and gutter, and 280 linear feet of reinforced concrete pipe, along with constructing 4,200 linear feet of asphalt roadway. Sealed bids are due March 5, 2025, at 10:00 AM at City Hall, with a non-mandatory pre-bid meeting scheduled for February 12, 2025, at 10:00 AM. Contractors must submit a 5% bid bond and will be evaluated based on their ability to complete the project within the 180-calendar-day contract period. The project is funded through the Georgia Department of Community Affairs Equity Fund Program and will be governed by State of Georgia Rules and Regulations.
The contract requires successful bidders to furnish performance and payment bonds for 100% of the contract price and maintain specific insurance coverages, including $1 million per occurrence general liability, $1 million auto liability, and workers' compensation insurance. Liquidated damages are set at $500 per calendar day for late completion. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the project's funding through the Equity Fund Program suggests potential preferences for diverse contractors. The project does not indicate existing incumbent vendors or specific integration requirements with current infrastructure. Though a precise budget range is not provided in the documents, the extensive infrastructure scope suggests a significant capital investment for this rural workforce housing initiative in Bacon County. Prospective bidders should carefully review the complete bid documentation, particularly the attached IFB No. 2501 document, to understand the full technical specifications and contractual requirements.
Opportunity text
The City of Alma, hereinafter referred to as ¿Owner¿, is currently requesting proposals to furnish all labor, equipment, materials, and other appurtenances for the installation of The construction of various utilities and roadways to supply the Teresa Estates Subdivision The installation of ±3300 linear feet of 8 IN DR 18 C900 PVC water main including hydrants, service, and meters. The installation of ±3041 linear feet of 8 IN SDR 26 PVC sanitary sewer main including manholes and service laterals. The installation of stormwater utilities includes ±8400 linear feet of 24¿ rollover curb and gutter and ±280 linear feet of 18-inch diameter reinforced concrete pipe. The construction of a ±4200 linear foot of asphalt roadway including subgrade material, graded aggregate base material, and asphalt paving.
Files
| File | Type | Posted |
|---|---|---|
| 24438_Teresa Estates Subdivision.pdf | ||
| IFB No_ 2501 _ City of Alma RWFHI Teresa Esta.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity