City of Alma Taylor Road Water Improvements

Closed State & local contract opportunity Posted

Solicitation number
PE-60350-NONST-2024-000000005
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Alma, Georgia is seeking proposals for the installation of 880 linear feet of 6-inch DR18 C900 PVC water main, including two hydrant assemblies, water meter connections, and connections to existing water mains. This Invitation for Bid (IFB) project, titled the "Taylor Road Water Improvements," requires the successful contractor to furnish all labor, equipment, materials, and other appurtenances necessary to complete the installation. The bid submission deadline is October 9, 2024, at 10 AM, and a non-mandatory pre-bid conference is scheduled for September 25, 2024, at 10 AM. The contract duration is 180 consecutive calendar days, and the bid shall be based on unit prices for estimated quantities, with final payment based on actual installed quantities. The City of Alma reserves the right to waive technicalities, reject any or all bids, and make the award in their best interest. The bid must be accompanied by a bid bond for at least 5% of the bid amount, and the successful contractor will be required to provide performance and payment bonds.

The IFB does not specify any set-aside designations or restrictions on the types of organizations that can respond. The contract will be awarded to the lowest responsive, responsible bidder based on the evaluation criteria outlined in the IFB. The document does not mention any incumbent vendors or current contractors, and it does not provide any information on the existing infrastructure or technology that requires integration. The IFB also does not include any details about the possible award value or budget range for this project.

Opportunity text

The City of Alma, hereinafter referred to as ¿Owner¿, is currently requesting proposals to furnish all labor, equipment, materials, and other appurtenances for the installation of ±880 LF of 6 IN DR18 C900 PVC water main including (2) hydrant assemblies, water meter connections, and connection to existing water mains. All appurtenances necessary to complete the installation shall be included. The adjacent existing water mains shall be reconnected to the new water main and all metered water services shall be reconnected to the new water main.

Files

File Type Posted
IFB_Project Manual Taylor Rd.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities