CI-277 F17 Northwest Wing Abatement & Interior Demolition
Open State & local contract opportunity Posted
- Solicitation number
- 0000040943
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC code
- Point of contact
-
- Daniel Brown daniel.brown@csuci.edu (805) 437-1628
Opportunity details come from caleprocure.ca.gov. Updated .
About this opportunity
The Trustees of the California State University, acting through CSU Channel Islands, is soliciting sealed bids for hazardous materials abatement and interior demolition of the northwest wing of Building F17 under Bid Solicitation CI-277, with a mandatory pre-bid walkthrough on November 20, 2026 and bids due December 8, 2026 at 2:00 p.m. The project carries a 3% Disabled Veteran Business Enterprise (DVBE) participation requirement, with a DVBE bid incentive of up to $30,000, and a small business preference that allows a non-small business bidder to claim a 5% preference by subcontracting at least 25% of the contract value to certified small businesses. Combined DVBE and small business adjustments may not exceed $50,000.
Bidders must hold current California State License Board certifications for C-22 (Asbestos Abatement), ASB (Asbestos Certification), HAZ (Hazardous Substance Removal), and C-21 (Demolition) licenses. They must also have at least five years of licensed abatement experience and three years of licensed demolition experience, and hold California Department of Industrial Relations public works registration. The project is subject to prevailing wage rates.
Scope includes abatement of identified hazardous materials, including crawl-space pipe insulation; removal of designated interior finishes, nonstructural walls, ceilings, and mechanical, electrical, and plumbing components; verification and repair of fire barriers; utility coordination; and containment, debris sorting, recycling, and lawful disposal. Existing structural concrete, rainwater leaders, and exterior elements remain, and the eastern remainder of Building F17 is excluded. The campus will provide independent abatement inspection and monitoring separately. Work is performed in Camarillo, California, in Ventura County, and the project duration is 90 calendar days from the Notice to Proceed.
The construction estimate for the base bid is $330,000.00 against a total construction budget of $375,000.00. Allowance No. 1 provides $25,000 for authorized unforeseen work, held outside the base bid total. Additive Alternate No. 1 for interior stair demolition is estimated at $20,000 and priced separately. Award goes to the apparent lowest responsive bid from a responsible bidder, determined on the base bid tallied with the additive alternate. Liquidated damages are $500.00 per day for completion delays. Surety bonds equal to 100% of the contract price are required under the general conditions.
Questions must be submitted through PlanetBids by November 30, 2026 at 2:00 p.m. Plans and bid documents are available beginning November 13, 2026 through a Microsoft OneDrive link in the Notice to Contractors.
Opportunity text
See NTC and attached SOW for more specifics. Link to additional files located in NTC. In general, the work consists of hazardous materials abatement and interior demolition of the northwest wing of Building F17, including the associated crawl spaces, at CSU Channel Islands, in accordance with the scoping document, exhibits, and specifications prepared by CSUCI. Work includes removal of designated interior finishes, nonstructural walls, ceilings, mechanical, electrical, and plumbing components; abatement of identified hazardous materials, including crawl-space pipe insulation; verification and repair of designated fire barriers; utility coordination; containment, debris removal, sorting, recycling, and lawful disposal. Existing structural concrete, rainwater leaders/piping, and exterior building elements shall remain except where specifically noted in the contract documents. The remainder of Building F17 to the east is excluded. Independent abatement inspection and monitoring will be provided separately by the campus.
Files
| File | Type | Posted |
|---|---|---|
| CI-277_Notice_to_Contractors_final.pdf | ||
| cgc_dbb_minor.pdf | ||
| aw_agreement_bonds_certification_forms_minor__4_.docx | DOCX document |