Chequamegon School District Mass Notification/Fire Alarm System RFP

Closed State & local contract opportunity Posted

Solicitation number
2026.2.11
State
Wisconsin
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from vendornet.wi.gov. Updated .

About this opportunity

The Chequamegon School District is seeking proposals for a comprehensive fire alarm system replacement project for its approximately 190,000 square-foot facility located in North Park Falls, Wisconsin. The Request for Proposal (RFP) requires a full-scale addressable medium to large fire alarm system installation that meets current Wisconsin State Code requirements. Contractors will be responsible for complete removal and disposal of all existing fire alarm system components and wiring, and must prepare for potential device box coverings in public spaces. The project involves installing a new voice audio fire alarm system across seven distinct floor plan areas, including classrooms, offices, gymnasiums, cafeterias, locker rooms, and mechanical spaces. The proposal is due on February 11, 2026, with the RFP originally posted on December 17, 2025. Contractors must ensure final system design complies with all applicable code requirements and are expected to coordinate closely with district administration, specifically Kyle Cronan, who can be reached at kcronan@csdk12.net or 715-762-2474 extension 2427.

While no specific set-aside designations or restrictions are explicitly outlined in the documentation, contractors will need to demonstrate technical expertise in fire alarm system design and installation for large institutional facilities. The blueprints, prepared by Siemens Building Technologies, Inc. Fire Safety Division, indicate a complex installation requiring sophisticated system knowledge. No incumbent vendor information is provided, and no specific budget range or award value is disclosed in the available documents. The project requires comprehensive system design that integrates with the existing facility infrastructure while meeting all current safety standards. Potential bidders should carefully review the technical blueprints, which are available in a 4MB PDF document titled "2026 FIRE ALARM RFP BLUEPRINTS.pdf" and were last revised on December 15, 2025. Contractors will be responsible for their own system design and must ensure full compliance with state and local fire safety regulations.

Opportunity text

1.04 SCOPE OF WORK COVERED BY CONTRACT DOCUMENTS
A. The Work of Project is defined by the Contract Documents and includes, but is not limited to,
the following:
Medium to Large Fire Alarm System
ADDRESSABLE MEDIUM TO LARGE FIRE ALARM SYSTEM 28 46 21 - 5
REVISION 24 12/17/2025
1. Fire alarm system replacement for the entire facility with an area of approximately 190,000 square feet.
2. Removal and disposal of all existing fire alarm system components, wiring, etc.
3. Cover of existing fire alarm device boxes if not re-used in new system installation where locations are visible in public spaces. Type of covering to be determined with direction from the owner on an as needed basis. Painting or other wall treatments for cosmetic purposes are the responsibility of the owner.

Files

File Type Posted
2026 FIRE ALARM RFP BLUEPRINTS.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity