The County of Ventura Department of Airports is soliciting bids for the Camarillo Airport-295 Willis Roof Rehabilitation Project under Specification No. DOA 26-04, with bids due October 30, 2026 at 3:00 p.m. through the Bonfire website. Bidders must hold a valid Class C-39 California Contractors license, have been established for a minimum of 12 consecutive months, and have completed at least three projects of similar nature and complexity. Prevailing wage rates apply, and the contractor and all subcontractors must register with the Department of Industrial Relations before bid time.

The scope covers cleaning and preparing the existing low-slope roof (approximately 135 roofing squares) and installing a mechanically fastened 60-mil felt-backed PVC single-ply membrane over the existing roof and parapet walls. Work includes removal, salvage, and reinstallation of parapet wall ridge tiles with replacement of broken tiles, roofing flashings and accessories, and PVC walk treads at HVAC access points. The project is located at Camarillo Airport in Ventura County. The bid guarantee must be not less than 10% of the bid amount, and the awarded contractor must furnish performance and payment bonds each at 100% of the contract price. The contract carries 5% retention and liquidated damages of $750 per calendar day for delays. No federal-aid contract provisions are included.

The project must be completed within 20 working days from the Notice to Proceed, which issues within 7 calendar days after the contract, bonds, and insurance certificates are returned. The county has 60 days to award. The non-mandatory pre-bid meeting was scheduled for October 22, 2026 at 9:00 a.m. at the project site, and that date has passed. Plan and specification questions must be submitted through the Bonfire "Opportunity Q&A" tab.

Opportunity text

Bids will be received for Camarillo Airport 295 Willis Roof Rehabilitation Project, for Specification No. DOA 26-04, Project No. CMA-243, which consists of cleaning and preparing the existing roof and installing a mechanically fastened 60-mil PVC felt-backed roofing membrane system over the existing roofing system and parapet walls, including removal, salvage, and reinstallation of the parapet wall ridge tiles with replacement of broken tiles, roofing flashings and accessories, walk tread at HVAC access points, and all associated work necessary to provide a complete and watertight roofing system.