Camarillo Airport-165 Durley Roof Rehabilitation Project
Closed State & local contract opportunity Posted
- Solicitation number
- CMA-242
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Danielle Tarr danielle.tarr@venturacounty.gov (805) 654-2018
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Ventura County Department of Airports is requesting sealed bids for the Camarillo Airport-165 Durley Roof Rehabilitation Project (Specification No. DOA 26-03, Project No. CMA-242) with bids due August 21, 2026 at 2:00 p.m. through the Bonfire website, and a non-mandatory pre-bid meeting on August 7, 2026 at 10:00 a.m. at the project site.
The scope encompasses cleaning and preparing the existing low-slope roof and installing a complete mechanically fastened 60-mil felt-backed PVC single-ply roofing membrane system, including removal and replacement of coping cap metal, roofing flashings, accessories, and PVC walk tread at HVAC access points. Work must be installed to manufacturer specifications and inspection procedures to secure the specified manufacturer's warranty.
Bidders must hold a valid Class C-39 California Contractors License, have been in business for a minimum of twelve consecutive months, and have successfully completed similar projects within the past five years. All work is subject to prevailing wage rates as determined by the California Department of Industrial Relations for Ventura County; contractors must register with the Department of Industrial Relations prior to bidding and maintain accurate payroll records. Bidders must list all subcontractors with valid Contractor's License Numbers and DIR Registration Numbers with their bids.
The contract commences 28 calendar days after award with a completion time of 20 working days from the Notice to Proceed and a maximum schedule of 60 working days with no breaks allowed. Liquidated damages are $750.00 per calendar day for failure to meet the schedule. A 5% retention will be withheld from all progress payments. Bidders must provide a bid guarantee of not less than 10% of the total bid amount in the form of a bid bond, cashier's check, certified check, or cash. The awarded contractor must furnish Performance and Payment Bonds each in the amount of 100% of the contract price upon award. This project is not a federal-aid project.
Opportunity text
In general, the Work includes cleaning and preparing the existing low-slope roof and installing a complete, mechanically fastened, 60-mil felt-backed PVC single-ply roofing membrane system over the existing roofing system, or comparable by approved substitution, including removal and replacement of the coping cap metal, roofing flashings and accessories, and PVC walk tread at the HVAC access points, all as required to provide a complete and watertight roofing system installed in accordance with the manufacturer's published requirements and inspection procedures so that the Department obtains the specified manufacturer's warranty upon completion.
Files
| File | Type | Posted |
|---|---|---|
| Camarillo Airport-165 Durley Roof Rehabilitation Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity