Build & Install Sutton Library Storage Cabinets
Open State & local contract opportunity Posted
- Solicitation number
- 27-063Q
- State
- Alaska
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Rustin Krafft purchasing@matsugov.us (907) 861-8601
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Matanuska-Susitna Borough Purchasing Division is soliciting quotes under RFQ 27-063Q for fabrication, delivery, and installation of two custom storage cabinet runs at the Sutton Library, with a mandatory site visit on November 10, 2026 at 10:00 AM AKDT and quotes due November 19, 2026 at 12:00 PM AKDT. Quotes must be submitted through Euna Procurement, and the Borough will not accept quotes over $50,000.
The scope covers two runs totaling eight cabinet stacks. Run #1 has four stacks at 135 inches overall width with a finished left end panel. Run #2 has four stacks at 141 inches overall width with a finished right end panel. Construction is frameless with full-overlay doors, Formica "Hard Rock Maple" laminate exteriors, white melamine interiors, soft-close concealed hinges, full-extension drawer slides, and adjustable shelving. Installation must produce level, square, and plumb cabinets with crown molding extending to the ceiling. The contractor furnishes all labor, materials, equipment, transportation, and supervision at the Sutton Library, 11301 N Chickaloon Way, Sutton-Alpine, Alaska.
The quotation must represent the best net price FOB destination, including all delivery charges and excluding applicable taxes. The Borough will award to the lowest responsive quote. Payment is Net 30 from receipt of goods and services and a correct invoice, and the Borough provides no deposits. Required insurance is Commercial General Liability of $1 million combined single limit, Auto Liability of $500,000, and Worker's Compensation as required by Alaska law. The contractor must warrant services as free from defects, indemnify the Borough against claims arising from its performance, and assume risk of loss until delivery. All work must be completed by December 31, 2026. No work may begin before a signed purchase order and direction from the Borough Project Manager.
Opportunity text
The Matanuska-Susitna Borough is seeking quotes from qualified vendors to fabricate, deliver, and install two (2) custom storage cabinet runs for the Sutton Library.
Files
| File | Type | Posted |
|---|---|---|
| 27-063Q Build Install Sutton Library Storage Cabinets.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity