Bryan-bulloch county transmittal main - phase II
Closed State & local contract opportunity Posted
- Solicitation number
- PE-77523-NONST-2024-000000003
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 08585 Soil Erosion Sheeting Material (To Include Silt Fencing): Asphalt, Biodegradable Paper, Burlap, Excelsior, Jute, Straw, Etc.
- 31590 Resins (Epoxy Only)
- 33504 Additives And Supplements, Fertilizer
- 34060 Hydrants, Fire (Including Accessories And Parts)
- 57895 Water, Potable (See 390-91 For Bottled Water)
- 65846 Pipe, Iron (Includes Ductile Iron Pipe)
- 65856 Pipe, Plastic (Includes. Fiber Reinforced Plastic Pipe, Polybutylene Pipe)
- 65917 Bends
- 65965 Reducers
- 65997 Pipe Fittings, Misc. (Not Otherwise Classified)
Show all 19
- 67081 Valves, Stainless Steel: Angle, Ball, Check, Gate, Globe, Etc.
- 72064 Sewage And Sludge Pumps, Submersible
- 74506 Asphalt, Cutback
- 74508 Asphalt, Emulsified
- 95115 Infrastructure & Infrastructure Improvements
- 96185 Utility Services, Water
- 98814 Erosion Control Services
- 98852 Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services)
- 98991 Water Sampling And Analysis Services
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Bryan-Bulloch County Transmission Main - Phase II project is a state and local contract opportunity posted by the Georgia Department of Transportation on behalf of Butts County. The scope of work is divided into three divisions: (1) the furnishment and installation of approximately 21,000 LF of 30-inch water main, 8,200 LF of 24-inch water main, and 1,400 LF of 16-inch water main; (2) the construction of a five-pump booster station; and (3) the construction of a new 1,800 gallon per minute (GPM) potable water supply well. The project requires horizontal directional drilling, jack and bores, valve and hydrant installation, and all other necessary appurtenances. A pre-bid meeting will be held on October 12, 2023, and sealed proposals must be submitted by 10:00 AM on November 2, 2023.
The project is federally and state-funded through the Water and Sewer Infrastructure, State Fiscal Recovery Funds (SFRF) program under the American Rescue Plan Act of 2021 (ARPA) and is eligible through the Drinking Water State Revolving Fund (DWSRF). Bidders must comply with various federal and state requirements, including the President's Executive Order Nos. 11246 and 11375, Title VI of the Civil Rights Act of 1964, the Davis-Bacon Act, the Anti-Kickback Act, and the Contract Work Hours Standard Act. The successful bidder must also provide a written oath certifying that they have not acted to prevent or attempt to prevent competition in bidding. The Build America, Buy America Act requires that all iron and steel, manufactured products, and construction materials used in the project be produced in the United States. The total estimated value of the contract is not specified.
Opportunity text
DIVISION I ¿ Water Distribution System: The scope of work in Division I includes the furnishment and installation of approximately 21,000 LF of 30¿inch water main, 8,200 LF of 24-inch water main and 1,400 LF of 16-inch water main parallel to U.S. Highway 80 and Old Cuyler Road. The work shall include horizontal directional drills (HDD), jack and bores, butterfly valves, air release valves, fire hydrants, and all other appurtenances necessary to complete the project. DIVISION II ¿ Booster Station: The scope of work in Division II includes the furnishment and installation of a five (5)-pump booster station along Old Cuyler Road. The work shall include all site work, piping, all electrical, SCADA, concrete, and other accessories as shown on the plans necessary to complete the project. DIVISION III ¿ 1,800 gpm Well: The scope of work in Division III includes construction of a new 1,800 gallon per minute (GPM) potable water supply well in Bulloch County near US Highway 80. The work in Division III includes the new 1,800 GPM deep Floridan Aquifer water well, wellhead piping, well building, electrical components, SCADA, and all necessary material, labor, and appurtenances associated with the new water supply well as shown on the plans and in the specifications.
Files
| File | Type | Posted |
|---|---|---|
| 00 21 00_ Advertisement for Bids .doc | DOC document | |
| 27691_0081B _ Addendum 4 with attachments.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity