Bridge Replacements at Winston Lake Golf Course

Open State & local contract opportunity Posted

Solicitation number
FB27115
State
North Carolina
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Winston-Salem, North Carolina is soliciting sealed bids under Invitation to Bid FB27115 for bridge replacements at Winston Lake Golf Course, with a mandatory pre-bid conference on November 12, 2026 and proposals due December 3, 2026. Attendance at the pre-bid conference, recorded on the sign-in sheet, is required for bid consideration. The conference is held at 10:00 AM at 3535 Winston Lake Road, and the site-visit RSVP deadline of November 9, 2026 has passed.

The scope covers repair and replacement of four bridges, each about 90 feet long and spanning streams, that carry pedestrian crosswalk, golf cart, and maintenance vehicle traffic. The bridges show timber deterioration, missing railings, and missing deck boards. The work includes replacing the bridges with PermaTrak per the project drawings, resurfacing trails, and paving the bridge approaches. Bidders must be licensed under Chapter 87 of the North Carolina General Statutes, and the awarded contractor must provide 100% performance and payment bonds. The City reserves the right to reject any or all proposals, and fewer than three bids requires re-advertisement.

Technical questions go to Catherine Knisley at catherinek@cityofws.org, with the question period closing at 5:00 PM on November 19, 2026. Sealed proposals endorsed "WLGC Bridge Replacements, FB27115" are due to City/County Purchasing at City Hall, 101 North Main Street, Winston-Salem, by 2:00 PM on December 3, 2026. The notice lists Forsyth County as the jurisdiction and was posted November 8, 2026.

Opportunity text

This project includes repairs of four (4) bridges at the Winston Lake Golf Course. The bridges are 90 feet long with variations in width that stretch across streams and are used for pedestrian crosswalk, golf cart passage, and maintenance vehicle pathways. There are timber deteriorations, missing railings, and missing deck boards. Scope includes replacement of existing bridges with PermaTrak as per the drawings as well as trail resurfacing and paving the approach to the bridge structure.

Files

File Type Posted
Winston Lake Golf Course Bridge Replacements.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors