Brea Olinda High School Gym Floor Replacement Project
Closed State & local contract opportunity Posted
- Solicitation number
- 25-0027
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Rick Champion rchampion@bousd.us (714) 990-7827
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Brea Olinda Unified School District is requesting bids for removal and replacement of wood athletic flooring in the main gymnasium at Brea Olinda High School, located at 789 Wildcat Way, Brea, California, with bids due June 1, 2026 at 1:00 p.m. via PlanetBids and a mandatory pre-bid conference and job walk on May 12, 2026 at 10:00 a.m.
Contractors must hold valid California Contractor's License classifications B and C-15 and be registered with the Division of Industrial Relations (DIR). The project is subject to prevailing wage requirements and all applicable public contract code provisions.
The scope includes demolition of existing wood athletic flooring, surface preparation, installation of new wood athletic flooring, court striping, and associated work as indicated in plans and specifications. Contract documents are available through PlanetBids or from the architect, PJHM Architects, Inc.
Bid security equal to not less than ten percent (10%) of the maximum bid amount is required with each bid. Questions must be submitted online through PlanetBids by May 21, 2026 at 1:00 p.m. The District reserves the right to reject any or all bids, waive irregularities, and determine the lowest responsive, responsible bidder. For additional information, contact Richard Champion, Assistant Superintendent of Business Services, at rchampion@bousd.us.
Opportunity text
Notice is hereby given that the Brea Olinda Unified School District will receive electronic bids submitted on the Districts online bidding platform, PlanetBids, for the Brea Olinda High School Gym Floor Replacement Project. The project consists of removal and replacement of the existing wood athletic flooring in the main gymnasium (Building C) at Brea Olinda High School, including demolition, surface preparation, installation of new wood athletic flooring, court striping, and associated work as indicated in the plans and specifications.
Files
| File | Type | Posted |
|---|---|---|
| Brea Olinda High School Gym Floor Replacement Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity