Boone's Ferry Road at Mercantile Drive Pedestrian Crosswalk Signal Project
Open State & local contract opportunity Posted
- Solicitation number
- WO 389
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Clackamas County is soliciting bids for the Boone's Ferry Road at Mercantile Drive Pedestrian Crosswalk Signal Project, with proposals due November 24, 2026.
The scope encompasses utility locates and pothole verification prior to mobilization, followed by installation of standard curbs, concrete sidewalk, three perpendicular curb ramps with truncated domes, and replacement of asphaltic concrete pavement and crushed rock base. The Contractor must perform necessary traffic signal modifications and remove and dispose of the existing fire hydrant and water lateral, then provide and install new fire hydrant and lateral facilities. Landscaping work includes placement of bark and mulch and permanent seeding within previously disturbed areas. Throughout construction, the Contractor must protect and preserve existing signal poles, light poles, drainage inlets, and utility boxes. Any damage to existing irrigation and utility facilities and associated piping is repaired and replaced at the Contractor's expense.
The place of performance is Boone's Ferry Road at Mercantile Drive in Clackamas County, Oregon. The attached Bid Notice does not specify estimated contract value, contract term, set-asides, preference programs, incumbent contractor information, evaluation criteria, pre-bid meeting or site-visit dates, or question submission deadlines. Bidders should contact Clackamas County directly or consult supplementary project documentation for complete financial and scheduling details.
Opportunity text
Scope of Work: The Contractor shall perform utility locates and pothole for existing prior to starting on-site work. Following verification of site utilities, the Contractor shall provide and install standard curbs, concrete sidewalk, three (3) perpendicular curb ramps, truncated domes, replacement of asphaltic concrete pavement and crushed rock base, and perform necessary Traffic Signal modifications. In addition, the Contractor shall remove and dispose of the existing fire hydrant and water lateral and provide and install a new fire hydrant and new lateral. The Project shall be constructed while protecting and preserving in-place signal poles, light poles, drainage inlets, and utility boxes. Ancillary to the construction work being performed, the Contractor shall place bark, mulch and plant permanent seeding within previously disturbed areas of the Project site. Damage to existing irrigation and utility facilities and associated piping shall be repaired and replaced at the Contractor's expense.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity