Bioswale installation, coastal erosion repair and habitat restoration
Cancelled State & local contract opportunity Posted
- Solicitation number
- 2130405
- State
- New York
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Jane Jackson jjackson@northshorelandalliance.org (516) 922-1028
Updated .
About this opportunity
The North Shore Land Alliance is requesting proposals for green infrastructure installation and coastal habitat restoration at a remediated eight-acre waterfront property at 95 Shore Road, Cold Spring Harbor, with proposals due February 11, 2026. The project site lies within the Town of Huntington municipal boundaries, with the Incorporated Village of Lloyd Harbor boundary adjacent to the north.
The scope encompasses bioswale installation along the property's north boundary with three riprap-lined chutes to convey stormwater runoff, repair of a 15-foot-wide by 2-to-3-foot-deep eroded gully using live willow stake riprap, culvert and outfall rehabilitation, bioswale overflow stabilization with stone and mortar riprap, and crushed stone berm reconstruction. Habitat restoration includes removal of invasive Phragmites and black locust across approximately 530 linear feet (21,000 square feet) of shoreline and replanting with native salt marsh grasses, shrubs, and other native species. The project targets reduction of stormwater flows currently measured at approximately 35 cubic feet per second during large storm events and reduction of pathogen contamination to Cold Spring Harbor. The property is being restored to prairie, wet meadow, maritime shrubland, beach, and dune eco-types.
Applicants must be licensed and insured to work within the Town of Huntington. Proposals should itemize separate estimates for construction and planting work. Contact Jane Jackson at the North Shore Land Alliance (jjackson@northshorelandalliance.org or 516-922-1028) to review project designs and obtain additional proposal requirements and information.
Opportunity text
The North Shore Land Alliance is seeking proposals for installing green infrastructure to manage stormwater runoff at its eight-acre waterfront remediated former ExxonMobil property at 95 Shore Road, Cold Spring Harbor. The work will entail restoring natural shoreline habitat, repairing an eroded gully and outfall and installing a bio-infiltration system. The property lies within the municipal boundaries of the Town of Huntington, and the Incorporated Village of Lloyd Harbor municipal boundary line is located just north of the parcel. It is being restored as prairie, wet meadow, maritime shrubland, beach and dune eco-types, and is currently providing open space, shoreline habitat and a small grassland along the Harbor. Current stormwater management in the area is insufficient, causing stormwater flows of +/-35 cubic feet/second to be conveyed through 95 Shore Road during large storm events. This volume of runoff has led to flooding of the northern area of the property during moderate to large storm events, as well as the creation of a 15' wide by 2-3' deep gully just upstream of the existing outfall. Our goal is to reduce stormwater volume and velocity as well as pathogens contamination of Cold Spring Harbor through installation of a bio-filtration system that will add to the native habitat already protected there. The current volume of runoff has led to flooding of the northern area of the property during moderate to large storm events, as well as the creation of a 15' wide by 2-3' deep gully just upstream of the existing outfall. This project will entail · installing a bioswale along the property's north boundary with three riprap-lined chutes from a neighboring driveway to convey runoff to the bioswale which will be lined with a turf reinforcement mat and planted with salt marsh grasses and shrubs · repairing an eroded gully with live willow stake riprap · overhauling an existing culvert and outfall at the property boundary · stabilizing bioswale overflow with stone and mortar riprap · reconstruction of crushed stone berm · conducting habitat restoration along 530 linear feet (approximately 21,000 square feet) of shoreline through management of Phragmites and black locust trees and saplings and planting with native shrubs and grasses. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: NONE Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00%
Files
| File | Type | Posted |
|---|---|---|
| Request for Proposals Shore Road NYS CS.doc | DOC document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities