Big Piney Office Interior Sewer Line Replacement

Closed State & local contract opportunity Posted

Solicitation number
1240LT26Q0154
State
Wyoming
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The U.S. Forest Service is soliciting quotes for sewer line replacement and related demolition and restoration work at the Big Piney Ranger Station on the Bridger-Teton National Forest in Wyoming, with quotes due September 14, 2026. This is a Total Small Business Set-Aside under NAICS 237110 (Water and Sewer Line and Related Structures Construction), restricting bidding to qualified small businesses.

The scope includes demolition of finished flooring as needed, removal of concrete slab covering approximately 81 feet of sewer line, disconnection of 17 plumbing fixtures, replacement of the sewer line, patching and restoration of concrete slab with aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. The contractor must remove and properly dispose of all demolished materials and provide all required materials. Quotes must describe the proposed methodology for sewer line replacement and identify all areas affected by related demolition work.

The period of performance runs from November 1, 2026, to January 29, 2027, and the work is located at the Big Piney Ranger Station in Sweetwater County, Wyoming. No contract value is disclosed.

Opportunity text

Total Small Business Set-Aside, 237110 - Water and Sewer Line and Related Structures Construction. This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). Work will include demolition of finished flooring as needed, demolition of concrete slab along 81 of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work. PoP 11/01/2026 to 01/29/2027.

Files

File Type Posted
C04f_Specs_BigPineySewer.Repair_2026.07.30.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity