Bid Prequalification - Remaining Trade Contractors 2025 (P1) Student Housing Program
Closed State & local contract opportunity Posted
- Solicitation number
- 0000035363
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 72152403 Entryway and exit framing service
- 72152100 Acoustical and insulation services
- 72154503 Crane rental service
- 72152000 Plastering and drywall services
- 72152900 Structural steel erection services
- 30171505 Metal doors
- 72101521 Building framing service
- 72152600 Roofing and siding and sheet metal services
- 78101801 Local area trucking services
- Point of contact
-
- Michele Winterfeldt mwinterf@calpoly.edu
Opportunity details come from caleprocure.ca.gov. Updated .
About this opportunity
California Polytechnic State University, San Luis Obispo, in partnership with The Whiting-Turner Contracting Company, is conducting a prequalification bid for trade contractors to support the Cal Poly Student Housing Program. The procurement seeks qualified contractors for specific trade scopes, including Mobile Crane, Site Built Steel, Insulation, Sheet Metal, Doors & Hardware, Framing, Drywall & Plaster, Joint Sealants, and Trucking (Modules). The program's primary objective is to implement the 2035 Master Plan, which aims to create housing for approximately 15,000 student beds, encompassing three new construction projects at the North Mountain and K-2 parking sites and renovations of six existing residential halls. The prequalification period is open from April 29, 2025, at 12:00 PM PT to May 13, 2025, at 5:00 PM PT, with interested trade contractors required to submit documentation directly to Whiting-Turner. Evaluation will focus on contractors' qualifications, capabilities, and ability to meet the specific trade requirements for this comprehensive housing development program.
The procurement does not explicitly specify set-aside designations or restrictions for disadvantaged enterprises. The project is subject to Prevailing Wage Rates, and a future Request for Proposal (RFP) will be issued exclusively to prequalified trade contractors who successfully submit all required deliverables. Preliminary design-build cost estimates indicate significant investment, with new housing projects ranging from $175 million to $275 million and renovation projects ranging from $24 million to $31 million. The phased approach is strategically designed to minimize disruption to campus life, with projects planned to be completed in a manner that ensures continuous student housing availability. While no incumbent vendors are specifically mentioned, the project represents a substantial long-term commitment to expanding and improving student housing infrastructure at California Polytechnic State University, San Luis Obispo.
Opportunity text
California Polytechnic State University, San Luis Obispo and The Whiting-Turner Contracting Company (as the Design-Builder) are seeking qualified Trade Contractors, for the scopes shown below, who wish to provide construction services for the Cal Pol Student Housing Program. 01H - Mobile Crane 05A - Site Built Steel 07B - Insulation 07E - Sheet Metal 07H - Joint Sealants 08A - Doors & Hardware 09A - Framing, Drywall & Plaster 13D - Trucking (Modules) SEE ATTACHED ANNOUNCEMENT FOR DETAILS OF HOW TO REQUEST THE PREQUALIFICATION DOCUMENTATION FROM WHITING-TURNER. RESPONSES ARE TO BE PROVIDED DIRECTLY TO WHITING-TURNER ONLY PROGRAM SCOPE: The 2035 Master Plan accounts for nearly 15,000 beds of student housing to accommodate the first and second year live-on requirements as well as maintaining housing for transfer and returning upper division students. To begin to meet this need, the University intends to design and construct three (3) new student housing projects at the current North Mountain and K-2 parking sites and renovate six (6) existing residential halls at the current South Mountain site. Presently, the intent is to use a phased approach for three new construction projects and six renovation projects over the course of the ten-year Program, starting design in January 2024. Projects would be completed strategically to reduce the impact to campus life and allow for students to continue with no interruption. Preliminary Design-Build cost estimates for the three new housing projects range from $175M to $275M each, with the six renovation projects ranging from $24M to $31M each.
Files
| File | Type | Posted |
|---|---|---|