Bel Lido Bridge Rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
ITB-25-003-0-2025/SC
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from demandstar.com. Updated .

About this opportunity

The state and local contract opportunity is an Invitation to Bid (ITB No. 25-003) issued by Palm Beach County, Florida, for the comprehensive rehabilitation of the Bel Lido Bridge. The project encompasses multiple critical infrastructure improvements, including concrete pier encasement for four piers, concrete patch and epoxy crack repairs, removal and replacement of decorative bridge wall caps, asphalt milling and overlay, chemical grouting of approach slab voids, and surface cleaning and coating. Key deliverables include full bridge deck restoration, maintenance of traffic during construction, and strict environmental protection measures compliant with NPDES and FDEP permit conditions. The procurement requires contractors to coordinate with the owner and engineer, protect existing landscaping, and replace any damaged sod at their own expense. The solicitation was posted on September 17, 2025, with bid submissions due by October 22, 2025. The attached Engineer Drawings (4MB) and ITB document (5MB) provide comprehensive technical specifications and bidding requirements for interested contractors.

While specific set-aside designations are not explicitly detailed in the provided documentation, the project requires contractors to demonstrate significant environmental compliance capabilities, particularly regarding water quality protection and pollutant management during construction activities. Contractors must submit NPDES Notice of Intent (NOI) and Notice of Termination (NOT) documents, indicating a robust environmental management requirement. The project involves complex infrastructure rehabilitation that likely requires specialized civil engineering and bridge restoration expertise. Although the exact budget range is not specified, the comprehensive scope of work—including pier rehabilitation, decorative wall replacement, deck restoration, and environmental protections—suggests a substantial municipal infrastructure investment. The technical complexity and environmental compliance requirements imply that only experienced, well-equipped contractors with demonstrated capabilities in bridge rehabilitation and environmental management will be competitive for this procurement.

Opportunity text

1. Bridge Pier Rehabilitation: Concrete pier encasement (4 piers), concrete patch repair at location(s) identified on plans and epoxy crack repair at location(s) identified on plans. 2. Removal of existing decorative bridge wall cap (EIFS material) and replacement with anchored, precast concrete decorative bridge wall cap. 3. Asphalt milling, asphalt overlay and striping of bridge deck and approaches. 4. Chemical grouting of voids at identified locations at the bridge approach slabs. 5. Cleaning and coating of bridge surfaces, abutment cap, bridge railing and existing utility pipes as indicated on the plans and in the Measurement & Payment item. 6. Removal and reinstallation of existing guardrail (if necessary) to complete the rehabilitation work. 7. Maintenance of Traffic and coordination with the Owner and Engineer during construction. 8. Environmental Protections: a. Contractor is responsible for coordinating and meeting all NPDES and FDEP permit conditions and regulations specifically and including protection of water quality. This includes prohibition of runoff of deleterious material resulting from surface preparation, paint splatter, concrete work, paving, milling, and overlay, etc. and all pollutants resulting from construction activities from being introduced into the waterway during any and all phases of work. b. Contractor is responsible for submitting for an NPDES Notice of Intent (NOI) and Notice of Termination (NOT) as required for construction of the project. 9. Restoration: a. Existing landscaping and other improvements shall be protected during construction. Sod that is damaged during construction shall be replaced at the contractor's expense. All restoration shall be at the contractor's expense.

Files

File Type Posted
Engineer Drawings.PDF PDF
ITB No. 25-003.PDF PDF