Basin 15 Drainage Improvements - Phase 1 - NW 108th Avenue Culvert Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- BID 26-67-05-MS-0-2026/mjs
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Maria Salvatierra msalvatierra@sunrisefl.gov (954) 572-2274
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Sunrise, Florida is requesting sealed bids for Basin 15 Drainage Improvements—Phase 1, a culvert replacement project on NW 108th Avenue, with bids due June 25, 2026 at 2:00 p.m. EDT.
The scope encompasses sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, dewatering, demolition and replacement of existing canal and street drainage culvert pipe and structures, demolition and restoration of pavement curb and sidewalk, shaping and excavation of existing canal banks, construction of concrete end walls and filter point grout mat, replacement of existing 10-inch PVC gravity sewer main with 10-inch ductile iron pipe, pavement milling and resurfacing, pavement markings, sodding, guardrail installation, and miscellaneous incidental items as shown in the drawings. The work is classified under multiple NIGP categories related to drainage engineering, flood control engineering, public utilities maintenance and repair, and storm drainage.
A non-mandatory pre-bid conference is scheduled for June 9, 2026 at 9:00 a.m. at the Everglades Room, 10770 W Oakland Park Boulevard, Sunrise, Florida 33351. The bid package includes drawings (6.32 MB), specifications (1.49 MB), and bid documents (1.65 MB) available through DemandStar. As of the broadcast date, 18 planholders have accessed the package. No bid bond requirement is specified in the bid documents. No contract value, contract term, incumbent contractor information, or evaluation criteria are identified in the available source material.
Opportunity text
The Work to be performed under these Contract Documents is generally described as follows: The project work will include sediment and turbidity control, pollution prevention, clearing and grubbing, maintenance of traffic, canal bypass pumping, dewatering, demolition and replacement of existing canal culvert pipe and street drainage pipe and structures, demolition and restoration of pavement, curb and sidewalk, shaping and excavation and grading of the existing canals banks, construction of concrete end walls, construction of filter point grout mat, replacement of existing 10 PVC gravity sewer main with 10 ductile iron pipe, pavement milling and resurfacing, pavement markings, sodding, guardrail and other miscellaneous and incidental items for a complete project.as shown in the drawings.
Files
| File | Type | Posted |
|---|---|---|
| sunrise1 OpenBids-DemandStar.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity