Bailey Hall Complex Abatement
Open State & local contract opportunity Posted
- Solicitation number
- 02-300-27-4295
- State
- Minnesota
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Board of Regents of the University of Minnesota is soliciting proposals for hazardous materials asbestos abatement across the Bailey Hall Complex on its St. Paul campus, with questions due November 5, 2026 and proposals due November 17, 2026 at 2:00 p.m. Central Time. The mandatory pre-proposal meeting was scheduled for October 27, 2026 at St. Paul Student Center Room 202. Compliance with Minnesota Statutes Section 16C.285 responsible contractor minimum criteria is a mandatory pass/fail requirement. The source names no set-aside or preference program.
Scope covers three buildings: Bailey Hall, Bailey Dining Center, and St. Paul Student Center. The University may award one or two buildings per contractor or all three to a single contractor, and respondents may propose on one building. Selections are made at the building level. Contractors must submit fixed lump-sum bids covering all labor, materials, equipment, overhead, and profit, and must meet prevailing wage requirements, provide acceptable certificates of insurance and payment and performance bonds, and maintain a University safety score of 5.0 or greater. The contract is the University's Hazardous Materials Abatement Agreement (OGC-SC690), with no exceptions or deviations permitted.
The total construction budget is $3 million, with $1 million allocated to each building. Evaluation criteria are team qualifications (20 points), project approach and work plan (20 points), project schedule (30 points), project cost (25 points), and safety (5 points).
The selected respondent will be identified by November 30, 2026, with authorization to proceed anticipated December 4, 2026. Abatement in Bailey Hall begins December 14, 2026, and work in Bailey Dining Center and St. Paul Student Center begins January 4, 2027. All abatement must be complete by April 30, 2027. The RFP package includes asbestos survey reports, demolition site plans, abatement specifications, prevailing wage rates, and the University's standard contract terms and building standards.
Opportunity text
The scope of the Project consists of hazardous materials abatement Work associated with the Bailey Hall Complex on the University of Minnesota St. Paul campus. The University is evaluating future uses and improvements within the Bailey Complex in preparation for the new St. Paul Residential Housing replacement facility and will authorize abatement Work within the Bailey Complex for one or more buildings, portions of buildings, or combinations thereof. The University may award this Work to multiple contractors (with one or two building(s) per contractor) or award all three buildings to a single contractor. Respondents may choose to propose on only one building. Selections will be made based on evaluations at the building-level.
Files
| File | Type | Posted |
|---|---|---|
| RFP - Abatement of Bailey Complex - Final.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity