Assist in Relocation of Single Family Dwelling

Closed State & local contract opportunity Posted

Solicitation number
RFP-2526-537
State
Virginia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Danville Public School System is requesting bids for partial demolition and relocation setup of a single-family dwelling from 161 Mountain View Avenue, Danville, Virginia to the George Washington High School campus at 280 Christopher Lane, Danville, Virginia, with bids due September 1, 2026.

The scope includes disconnecting all utilities and capping plumbing lines; removing the garage and sunroom from both ends of the structure; salvaging and reinstalling siding and windows on the two ends; digging and pouring new footings; constructing a concrete masonry unit foundation wall with a minimum height of 48 inches to the sill plate, adequate vents, and a 30-inch by 36-inch access door; and constructing a 6-foot by 6-foot ADA-accessible wooden porch at the front entrance. All work must be coordinated with the structure moving contractor selected separately by the district. Bidders must demonstrate expertise in demolition, foundation work, building restoration, and coordination with the moving contractor.

No estimated contract value, contract term, evaluation criteria, pre-bid meeting date, or question deadline is identified in the source materials.

Opportunity text

The Danville Public School System will award a contract for all labor and materials needed for the Partial Demolition and Setting up the Relocation of Single Family Dwelling, located at 161 Mountain View Ave., Danville, VA, to a preselected location on the carnpus of George Washington High School, 280 Christopher Lane, Danville, VA to the most qualified bidder. All work must be coordinated with Structure Moving Contractor. The work involves but not limited to: Disconnecting all utilities capping off any plumbing piping from the structure. The removal of the garage and sunroom located on each end of the structure. Salvaging the siding and windows and placed in the structure prior to moving. Dig and pour new footing to support the main house. Once house is in place, construct a CMU foundation wall of a minimum height of 48" to sill plate with adequate vents and minimum 30"x 36" access door. Install salvaged siding and windows on the two ends where the garage and sunporch were removed. Construct a 6'x 6' ADA accessible wooden porch at the existing front porch.

Files

File Type Posted
837782bldgDps.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors