The Maryland Department of Transportation State Highway Administration is requesting online electronic bids for reconstruction of twelve ADA-compliant sidewalk ramps along US 40 Alt. in LaVale, Maryland (Allegany County), with bids due February 4, 2026 at 12 Noon Eastern time through https://www.bidx.com/maryland/main.
The project spans approximately 1.4 miles from Cupler Drive to N. Woodlawn Avenue (MP 8.003 to MP 9.424) and includes construction of new sidewalk and ADA ramps, curb and gutter, curb walls, and detectable warning surfaces; removal and resetting of metal railings; erosion and sediment control; traffic maintenance; and miscellaneous repairs as noted on the plans. The twelve ramp locations are identified at specific intersections: Cupler Drive (NW corner), Helman Drive (NW and NE corners), Locust Street (SW and SE corners), West Street (SW corner), East Street (SE corner), Mary Court (SE corner), N. Lavale Street (NW and NE corners), S. Lavale Street (SW corner), and N. Woodlawn Avenue (NE corner). All work must meet ADA requirements. The road is not designated as part of the National Highway System.
Bidders should access the MDOT SHA online bidding platform for complete project specifications, detailed bidding instructions, and additional contract terms. Pricing, set-asides, contract value, term, incumbent information, and evaluation criteria are not detailed in the advertisement notice and should be confirmed in the full solicitation documents.
Opportunity text
This project, located in Allegany County, is for the reconstruction of twelve sidewalk ramps along US 40 Alt. from Cupler Drive to N. Woodlawn Avenue in LaVale, MD. to meet ADA requirements. The work will consist of the following: (a) Constructing new sidewalk and ADA ramps. (b) Constructing new curb and gutter. (c) Constructing curb walls. (d) Installing detectable warning surfaces. (e) Removing and resetting metal railings. (f) Erosion & Sediment Control. (g) Maintenance of traffic. (h) Other miscellaneous repairs as noted on the plans. Specific locations for this contract are listed herein with the work to be performed. They include the following: US 40 Alt. from Cupler Drive to N. Woodlawn Avenue (MP 8.003 to MP 9.424). This road is not on the NHS. ADA Ramp Locations: 1. US 40 Alt. at Cupler Drive - NW Corner 2. US 40 Alt. at Helman Drive - NW Corner 3. US 40 Alt. at Helman Drive - NE Corner 4. US 40 Alt. at Locust Street - SW Corner 5. US 40 Alt. at Locust Street - SE Corner 6. US 40 Alt. at West Street - SW Corner 7. US 40 Alt. at East Street - SE Corner 8. US 40 Alt. at Mary Court - SE Corner 9. US 40 Alt. at N. Lavale Street - NW Corner 10. US 40 Alt. at N. Lavale Street - NE Corner 11. US 40 Alt. at S. Lavale Street - SW Corner 12. US 40 Alt. at N. Woodlawn Avenue - NE Corner ONLINE ELECTRONIC BIDS for the project(s) listed below will be received by the Maryland Department of Transportation State Highway Administration (MDOT SHA) at https://www.bidx.com/maryland/main until 12 Noon Eastern time on the date specified below for the Bid Opening, at which time they will be opened.
Files
| File | Type | Posted |
|---|---|---|
| AL5875133 Advertisement Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity