Navarre Beach Event Hall and Boardwalk Complex
Closed State & local contract opportunity Posted
- Solicitation number
- 26-051
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Dedria Lunderman purchasing@cityofpensacola.com (850) 435-1603
- Procurement Department procurement@santarosa.fl.gov (850) 983-1851
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Pensacola, Florida is requesting sealed bids for Airfield Stormwater Improvements at Pensacola International Airport under ITB 26-051, with bids due August 20, 2026 at 2:30 p.m. Central time. A Disadvantaged Business Enterprise (DBE) participation goal of 12.0 percent applies to this contract.
The scope includes removal of existing drainage structures, installation of new stormwater drainage concrete pipe and associated junction structures along Taxiway A, regrading of infield areas, adjustment of impacted stormwater drainage, re-establishment of an asphalt driveway, and miscellaneous grading as required. All construction must comply with an approved Construction Phasing and Safety Plan per FAA AC 150/5370-2G. The project is funded by the FAA Airport Improvement Program, FDOT, and the City of Pensacola.
The contract duration is 140 calendar days from Notice to Proceed to Substantial Completion, including a 20-day mobilization period, plus an additional 45 calendar days for project closeout. Contractors must commence work within 10 consecutive calendar days after notification. Bid prices must be firm with all applicable Federal, State, and Local sales and use taxes included. A bid bond or certified check of 5 percent of the base bid, valid for 60 days, must accompany each proposal. Performance and Payment Bonds are required for contracts exceeding $25,000. Contractor's liability insurance must include minimum limits of $1,000,000 per occurrence and $5,000,000 aggregate, with the City and FDOT named as Additional Insureds. Liquidated damages are assessed at $500 per calendar day for delays beyond the Contract Duration.
Bidders must provide a Statement of Bidder's Qualifications with a minimum of five qualifying project references specific to the prime contractor, with at least three from other government municipalities if the bidder has not contracted with the City on similar projects within the previous five years. Questions are due July 15, 2026 at 10:00 a.m. Central time. An optional pre-bid conference and site tour are scheduled for August 4, 2026 at 10:00 a.m. at Pensacola International Airport. Bids will be publicly opened August 21, 2026 at 10:00 a.m.
Opportunity text
2 versions
Update #2 · Latest ·
The Santa Rosa County Board of County Commissioners is soliciting sealed bids from qualified contractors for the construction of the Navarre Beach Event Hall and Boardwalk Complex located on Navarre Beach, Florida. The project consists of two companion construction plan sets. The "Navarre Beach Event Hall and Boardwalk" plans comprise the architectural improvements for the Event Hall and associated elevated structures. The "Navarre Beach Parking Lot & Restroom" plans comprise the civil improvements, including the new parking lot, roadway, utilities, stormwater infrastructure, and associated site improvements. Together, these plan sets provide the complete scope of work for the project. The project is being bid with a Base Bid A (Architectural), Base Bid B (Parking Lot & Restroom), and multiple Bid Options, providing the County with flexibility in awarding work based on available funding. The County reserves the right to award any combination of the Base Bid A, Base Bid B, and/or Bid Options in accordance with the Contract Documents.
Update #1 ·
The proposed scope of work for this project, Airfield Stormwater Improvements, consists of installation of stormwater drainage concrete pipe and associated junction structures along Taxiway A and into the regional stormwater pond on the airport. The specific scope of the project includes the following: Removal of existing drainage structures Installation of new stormwater drainage concrete pipe and structures Regrading of infield areas and adjustment of impacted stormwater drainage Re-establishment of the asphalt driveway removed due to installation of new concrete pipe Miscellaneous grading, stripping, etc. as required by the project elements Construction will be performed in accordance with approved Construction Phasing and Safety Plan (CSPP) in accordance with FAA AC 150/5370-2G
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity