Aeration Blower/Air Piping Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- COE 2025-11
- State
- Wisconsin
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- Point of contact
-
- Ramona Flanigan rflanigan@edgerton.wi.gov (608) 884-3341
Opportunity details come from vendornet.wi.gov. Updated .
About this opportunity
The City of Edgerton is seeking sealed bid proposals for a Wastewater Treatment Facility (WWTF) aeration blower and air piping replacement project. The procurement involves removing the existing aeration blower No. 1 and installing a new Aerzen hybrid blower, along with approximately 120 linear feet of 10" 304 stainless steel Schedule 10 above-grade air piping. Key deliverables include complete equipment removal, installation of the new blower and associated equipment, widening of the concrete pad, and coordination with city contractors for electrical and control system upgrades. The project requires a comprehensive approach to equipment replacement with specific technical requirements, including start-up operations with Aerzen representatives and electrical/control experts. Sealed bid proposals are due by 4:00 P.M. on August 7, 2025, and must be submitted to Cedar Corporation in Madison, Wisconsin. Bidders must include a certified check or bid bond equal to 5% of the proposal amount, and proposals will remain valid for 30 days after opening.
The contract does not specify explicit set-aside designations or restrictions for disadvantaged business enterprises. Bidders will be required to demonstrate technical capability to install specialized wastewater treatment equipment and coordinate with multiple stakeholders. The city has already procured the Aerzen blower equipment, which is expected to be delivered by October 31, 2025, with project completion required no later than December 19, 2025. While specific budget ranges are not detailed in the documentation, bidders must provide a lump sum cost proposal and identify potential hourly rates for additional work. The project involves replacing one of three existing blowers at the facility, each originally rated at 700 SCFM at 11 psig and 60 HP. The city reserves the right to reject any or all proposals, indicating flexibility in the procurement process. Contractors should be prepared to minimize disruptions to ongoing wastewater treatment facility operations during the equipment replacement.
Opportunity text
The City of Edgerton Sewer Utility is requesting sealed bid proposals by 4:00 P.M., August 7, 2025, for the replacement of the one aeration blower along with air piping replacements at the City's Wastewater Treatment Facility (WWTF).
The project includes the following scope of supply:
- The existing aeration blower No. 1 is to be removed and provided to the OWNER for their storage/use as they select/determine. This includes the control panel and related electrical connections. All control and electrical connections are to be terminated to allow future new connections to the new Aerzen aeration blower equipment.
- Installation of one new Aerzen hybrid blower and associated equipment is to follow the removal of the existing equipment. Approved shop drawings for the new equipment are available upon request for determining the required work scope. The concrete pad for the blower also needs to be widened.
- Following the installation of the new Aerzen aeration blower and associated equipment, the City/Other Contractors will complete the electrical/instrumentation/control upgrades for the project to attain operational level for the new equipment. Start-up operation of the new equipment is to be completed onsite with Aerzen representatives, electrical/control representatives and the CONTRACTOR representatives. Any adjustments/corrections/modifications are to be completed by the CONTRACTOR at this time. It is expected that this work is to be completed no later than December 19, 2025.
- Additional work scope with this blower replacement is the installation of approximately 120 LF of 10" 304 SS Schedule 10 above grade air piping from the new Aerzen blower to the existing aeration basins.
The city has purchased new Aerzen blower equipment and is expecting delivery to the WWTF by October 31, 2025.
The sealed bid proposals are to be sent to Cedar Corporation, Attention Dave Sauer, P.E., 2820 Walton Commons West, Suite 142, Madison, WI 53718. Email: dave.sauer@cedarcorp.com. Additional detailed information for this project is available and can be requested by contacting Cedar Corporation at the above address.
The bid proposals shall be accompanied by a certified check payable to the City of Edgerton equal to 5% of the proposal or a bid bond of a bonding company authorized to do business in the State of Wisconsin in an amount equal to 5% of the proposal. Proposals shall not be withdrawn for a period of 30 days after the date of opening. The City of Edgerton reserves the right to reject any or all of the proposals and to waive any information therein.
Files
| File | Type | Posted |
|---|---|---|
| RFP - Aeration Blower Replacement.pdf |