Advertisment for bids sanitary sewer expansion 2026
Open State & local contract opportunity Posted
- Solicitation number
- PE-66166-NONST-2027-000000049
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141504 Timber removal service
- 72141126 Underground utilities construction service
- 72141123 Manhole construction service
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 72141503 Rock removal service
- 73151801 Sheeting services
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
Show all 19
- 72141505 Earthmoving service
- 73151802 Slitting services
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- Point of contact
-
- Brenda Strickland brendas@bainbridgecity.com (229) 248-2000
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Atlanta is requesting bids for a sanitary sewer expansion project under a fixed-price construction contract with bids due November 10, 2026 and a 180-day completion window from notice to proceed, with the new Spring Creek Charter Academy lift station operational by May 31, 2027.
The scope includes installation of a new duplex submersible lift station with a 6-foot diameter wet well, approximately 2,900 linear feet of 6-inch PVC sewer force main, approximately 50 linear feet of 10-inch PVC gravity sewer main, rehabilitation of one existing duplex submersible lift station, directional drills, manholes, electrical work, and pavement replacements. All force main and the new Spring Creek Charter Academy lift station must be installed, tested, operational, and ready for service by the May 31, 2027 deadline. Bidders must provide pricing for all labor, materials, equipment, and appurtenances necessary to complete the work as specified in the project documents.
The contract term is fixed at 180 consecutive calendar days from notice to proceed with no renewal options. No estimated contract value is stated in the available materials.
Opportunity text
SCOPE OF WORK - Work to be done shall consist of all labor, materials, equipment, and appurtenances necessary to complete the proposed improvements as shown in the Project Documents. More specifically, the scope includes installation of a new duplex submersible lift station featuring a 6' diameter wet well, +/- 2,900 LF of 6" PVC sewer force main, +/- 50 LF of 10" PVC gravity sewer main, rehabilitation of one existing duplex submersible lift station, directional drills, manholes, electrical, and pavement replacements. All force main and the new Spring Creek Charter Academy lift station shall be installed, tested, operational, and ready for service by May 31, 2027. Time allotted for completion of work is 180 consecutive calendar days.
Files
| File | Type | Posted |
|---|---|---|
| BID REQUEST FOR SANITARY SEWER EXPANSION 2026.pdf |