A-Dock WSDOT Port Electrification Upgrades

Closed State & local contract opportunity Posted

Solicitation number
CSM-58
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Port of Anacortes is soliciting sealed bids for the A-Dock WSDOT Port Electrification Upgrades in Anacortes, Washington, with bids due November 5, 2026 at 10:00 a.m. PST. Award goes to the lowest responsive and responsible bidder, and the project is funded in part through WSDOT and EPA grants.

The Port is procuring all labor, materials, and equipment for work defined in the project drawings and specifications. The scope includes temporary site, traffic and pedestrian, marine environmental and water quality, and erosion and sediment controls; miscellaneous upland demolition and disposal; site excavation and backfill; installation of electrification systems both upland and in-water; asphalt and concrete surface placements; and other site restorations and construction appurtenances. The Port states this scope is not limited to these items.

Sealed proposals must be plainly marked with the project title and number (Project #CSM-58) and the bidder's name and address, and must be received at the Port of Anacortes, 317 Commercial Avenue, Anacortes, Washington 98221. Plans, specifications, addenda, and contract documents are available through the Port's online plan room at http://bxwa.com. Questions must be emailed to Project Manager Jenkins Dossen at jenkins.dossen@portofanacortes.com with the subject line "Bid Inquiry - A-Dock WSDOT Port Electrification Upgrades, Project #CSM-58."

The Port reserves the right to reject any and all bids, waive irregularities or informalities in the bid or bidding process, or re-bid the project.

Opportunity text

The Project generally involves furnishing all labor, materials, and equipment necessary for the completion of the A-Dock WSDOT Port Electrification Upgrades in Anacortes, Washington as detailed in the Project drawings and specifications. The Project generally consists of, but is not limited to: implementation of temporary site controls, traffic/pedestrian controls, marine environmental/water quality controls, and temporary erosion and sediment controls; miscellaneous upland demolition and disposal; site excavation and backfill; installation of electrification systems both upland and in-water; asphalt and concrete surface placements; and other site restorations and construction appurtenances as more fully defined in the Contract Documents

Files

File Type Posted
CSM-58.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors