A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina
Open State & local contract opportunity Posted
- Solicitation number
- ITB 26-021-0-2026/LT
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Key West is requesting bids from qualified marine contractors for full replacement of A-Dock and decking replacement on D-Dock at Key West Bight Marina, with bids due November 16, 2026.
The A-Dock scope is complete structural replacement: removal and reconstruction of the existing timber dock including piles, pile caps, cross-bracing, stringers, and decking, plus new electrical, potable water, sewer pump-out, and fire protection systems and dock accessories. D-Dock work involves removal of existing composite decking and replacement with IPE hardwood decking. All hardware and fasteners must be 316 stainless steel. The contractor is responsible for all labor, materials, equipment, permits, and incidentals required for complete and working installation.
Work must comply with construction documents prepared by Tetra Tech and existing FDEP and USACE permits (USACE SAJ-2021-00839). Bidders must demonstrate qualification to perform marine construction work with capability to manage complex dock reconstruction projects involving structural, mechanical, and utility system installation.
No estimated contract value, incumbent contractor, evaluation criteria, pre-bid meeting date, or question deadline is specified in the available source material. Interested bidders should obtain the complete bid documents and detailed specifications from the City of Key West.
Opportunity text
The City of Key West is asking for bids from qualified marine contractors to fully replace A-Dock and replace the decking on D-Dock at the Key West Bight Marina. On A-Dock, the existing timber dock comes out completely and is rebuilt. That covers piles, pile caps, cross-bracing, stringers and decking, plus new electrical, potable water, sewer pump-out and fire protection systems and new dock accessories. On D-Dock, the existing composite decking is removed and replaced with IPE hardwood decking. All new hardware and fasteners are 316 stainless steel. The contractor provides all labor, materials, equipment, permits and incidentals needed for a complete and working installation. The work must follow the construction documents prepared by Tetra Tech and the existing FDEP and USACE permits (USACE SAJ-2021-00839).
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity