761/18036. SAR Union at Midtown Site - Site Restoration
Closed State & local contract opportunity Posted
- Solicitation number
- RFQ-171-180000000361-1
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
Updated .
About this opportunity
The Michigan Department of Technology, Management and Budget State Facilities Administration is seeking bids for a site restoration project at the Union at Midtown Site located at 4808 Cass Ave in Detroit, Wayne County. The procurement involves comprehensive underground storage tank removal and site remediation, specifically including the removal, cleaning, and disposal of six 1,000-gallon underground storage tanks. The project requires the excavation and disposal of approximately 1,000 tons of petroleum-impacted soils, pumping and disposal of 5,000 gallons of impacted excavation liquids, and backfilling with 1,000 tons of MDOT Class 2AA sand. Contractors must also complete site restoration, which includes replacing sidewalks, curbs, and gutters. The project has a mandatory pre-bid conference scheduled for February 14, 2018, at 9:30 AM, with electronic bids due February 28, 2018, at 2:00 PM through the SIGMA VSS website. The contract duration is 30 calendar days from the Notice-to-Proceed, and contractors must provide a 5% bid security and maintain $1,000,000 in pollution liability insurance.
No specific set-aside designations or restrictions for disadvantaged enterprises were mentioned in the project documentation. The project does not list incumbent vendors or specify integration requirements with existing infrastructure. Contractors must adhere to specific bid requirements, including a $20,000 provisionary allowance for unforeseen site conditions and liquidated damages of $2,000 per calendar day for late completion. Mobilization costs are capped at 4% of the base bid, and the contract includes unit pricing for soil excavation/disposal, backfill materials, and liquid disposal, with quantities subject to a 20% variation. Performance and payment bonds are required for bids exceeding $50,000. The project will be managed by The Mannik & Smith Group, Inc., with Brandon Alger serving as Project Manager, and utilizes NIGP codes 92630, 92678, and 92691. While no specific budget range was provided, the detailed specifications and allowances suggest a significant project investment in site restoration and environmental remediation.
Opportunity text
761/18036.SAR Union at Midtown Site - Site Restoration
Files
| File | Type | Posted |
|---|---|---|
| Specifications 18036.pdf | ||
| Advertisement 18036.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities