66821-24-RFP-B8399. 012
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66821-NONST-2024-000000003
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Here is a comprehensive two-paragraph summary of the state and/or local contracting opportunity:
The City of Bowdon in Candler County, Georgia is seeking bids for its 2024 Water System Improvements project. The project consists of various water system upgrades, including transferring 150 metered water services, installing 5,000 linear feet of new copper service line, cutting in and/or installing 20 insertion valves 6"-10", cutting in 12 fire hydrant assemblies, utility location via hydrovac, abandoning old water lines, and removing old fire hydrants. The work also includes grassing, asphalt/concrete patching, mobilization/demobilization, bonds, insurance, delivery of materials, and taxes. Sealed bids will be received until June 5, 2024 at 10:00 AM at the Bowdon City Hall, with a 150-calendar-day completion timeline from the date of the written Notice to Proceed. Funding for this project will be provided by the Drinking Water State Revolving Fund administered by the Georgia Environmental Finance Authority. The project will be subject to the Davis-Bacon Labor Standards, DBE Subcontract requirements, and the American Iron and Steel Act. Bidders must provide a bid bond or certified cashier's check in an amount not less than 10% of the base bid, and the successful bidder will be required to provide Performance and Payment Bonds, each in an amount equal to 100% of the contract price.
This opportunity is open to all qualified bidders, with no set-aside designations or restrictions on the types of organizations that can respond. The current incumbent or contractor is not specified. The total budget or award value for this project is also not provided in the available information.
Opportunity text
The project consists of, but is not limited to, the following major elements: Bidder agrees to furnish all materials and equipment and to perform all labor necessary to construct various water system improvements, including transferring metered water services (±150), including installing new copper service line to the meter (±5,000 LF), cut in and/or install insertion valves 6"-10" ( ±20), cut in fire hydrant assembly (±12), utility location via hydrovac, hourly or daily field investigation to determine active vs. non-active lines, abandoning old water lines, and removing old fire hydrants. The work also includes grassing, asphalt/concrete patching, mobilization/demobilization, bonds, insurance, delivery of materials, taxes, and all other appurtenances for necessary completion of the Work specified. Time allotted for completion of work is 150 calendar days from the date of a written "Notice to Proceed" from Owner. All Work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract.
Files
| File | Type | Posted |
|---|---|---|
| Invitation to Bid City of Bowdon 2024 Water S.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity