5075 Letcher County NRCS DSR 020 Left of Doty Creek R2 - Debris Removal and Stabilization
Closed State & local contract opportunity Posted
- Solicitation number
- 5075 DRS 020 - 2
- State
- Kentucky
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from dfs.bonfirehub.com. Updated .
About this opportunity
Letcher County, Kentucky, in cooperation with the USDA Natural Resources Conservation Service (NRCS), is soliciting proposals through a Request for Proposals (RFP) for stabilization and debris removal services at Left Fork Doty Creek under the Environmental Watershed Protection (EWP) Program. The procurement encompasses clearing designated areas through removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish; channel shaping; and installation of steel rail wall stabilization across five sites, with deliverables including debris removal, pollution control, seeding and mulching, mobilization and demobilization, rock riprap Class II channel lining (344 tons), steel railroad rail piling (1,361 linear feet), steel guard rail lagging (2,481 square feet), and grouting (18.7 cubic yards). Contractors must submit unit price proposals inclusive of all labor, equipment, materials, permits, mobilization, demobilization, traffic control, quality control, and pollution control measures in accordance with NRCS Standards and Specifications. Evaluation will be based on contractor capacity and experience (30 points), references (10 points), price using a specified formula (60 points), and optional interviews (up to 20 additional points), for a maximum total of 120 points. Key deadlines include an optional pre-proposal site visit on Wednesday, March 4, 2026, at 10:00 AM EST; proposal submission through the DFS Procurement Portal (dfs.bonfirehub.com) no later than March 11, 2026, at 2:00 PM EST; award on Monday, March 16, 2026; and project completion by May 16, 2026. Successful proposers must provide proof of liability, auto, and workers compensation insurance and comply with all federal, state, and local laws, including required certifications such as non-collusion declarations, lobbying certifications, affirmative action steps for small and minority businesses, debarment and suspension certifications, conflict of interest statements, and drug-free workplace affidavits.
All companies, including women, minority, and veteran-owned businesses, are actively encouraged to submit proposals, with no stated set-aside restrictions limiting competition. No incumbent vendors or current contractors are identified in the procurement documentation, and no existing infrastructure or technology integration requirements are specified. The solicitation does not disclose a specific award value or budget range, allowing the County to evaluate proposals based on the stated evaluation criteria and reserve the right to accept or reject any proposals and award multiple proposals per location or line item. Project funding is provided through the NRCS Environmental Watershed Protection Program, indicating federal support for this environmental restoration initiative. Prospective contractors should direct questions regarding the RFP to the DFS Portal at dfs.bonfirehub.com, while technical questions regarding portal registration or navigation should be directed to procurement@erassist.com.
Opportunity text
Letcher County (hereafter referred to as "County") is soliciting proposals from experienced contractors to provide Stabilization & Debris Removal services at Left of Doty Creek as part of the USDA Natural Resources Conservation Service's (NRCS) Environmental Watershed Protection (EWP) Program, according to NRCS Standard Practices and Specifications and Construction Plans, attached or referenced in Appendices A and B. The work consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish, and the shaping of the channel. The work for this project also involves shaping the channel. The planned work will stabilize the rail wall along the channel to lessen flooding hazards in rural areas. Work will consist of moving and adding material along the channel. Proposers are encouraged to attend a Pre-Proposal Meeting scheduled for Wednesday, March 4, 2026 at 10:00 AM EST at the Letcher County Fiscal Court, 156 Main St STE 107, Whitesburg, KY 41858 Proposals and all required documents must be submitted online to the DFS Procurement Portal (hereinafter "DFS Portal" or "Portal") at dfs.bonfirehub.com no later than March 11, 2026 at 2:00 PM, local time (EST). Award is set to occur at the Letcher County Fiscal Court, 156 Main St STE 107, Whitesburg, KY 41858 on Monday, March 16, 2026. Addenda regarding this RFP will be posted to the DFS Portal at dfs.bonfirehub.com. Proposers are responsible for obtaining addenda and are advised to check the website frequently. Questions regarding this RFP are to be submitted to dfs.bonfirehub.com. For questions regarding portal registration or navigation, please email: procurement@erassist.com. All companies, including women, minority, and veteran owned businesses are encouraged to submit a proposal.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity