4663 Letcher County - Rip Rap Group 30 – Shoulder Repair
- Letcher County Fiscal Court is requesting bids for shoulder repair and rip rap installation across six site locations, with bids due July 9, 2026 at 9:00 AM ET and award anticipated July 10, 2026. Work must be completed by July 29, 2026. The county actively encourages minority, women, veteran-owned, and HUBZone businesses to respond. The scope includes geotextile fabric installation, Class II Channel Lining provision and installation, DGA road base installation, and removal of temporary...
- Letcher County Fiscal Court is requesting bids for shoulder repair and rip rap installation on Bartesta Road, with bids due July 9, 2026 at 9:00 a.m. EST through the DFS Procurement Portal and contract award anticipated at a special Fiscal Court meeting on July 10, 2026. The scope includes removal of approximately 380.62 tons of temporary rip rap, installation of 840 square yards of geotextile fabric, 512.80 tons of Class II channel lining, and 53.18 tons of DGA road base, plus mobilization...
- Letcher County Fiscal Court in Kentucky is requesting bids for shoulder repair and rip rap installation on Bilvia Drive and Webb Branch Road, with bids due July 9, 2026 at 9:00 a.m. EST and award scheduled for July 10, 2026. The scope includes geotextile fabric (368.2 square yards), Class II Channel Lining/Rip Rap (117 tons), and DGA road base (13.12 tons) across seven designated sites identified by GPS coordinates. Work must be completed by July 29, 2026. Bidders must provide mobilization,...
- Letcher County Fiscal Court in Kentucky is requesting bids for shoulder repair and rip rap installation on Bull Creek Road, with bids due July 9, 2026 at 9:00 a.m. EST and bid opening at 10:00 a.m. EST the same day at the Letcher County Judge Executive's Office in Whitesburg. Award is anticipated July 10, 2026. The county actively encourages minority, women, veteran-owned, and HUBZone business responses. The scope encompasses provision and installation of geotextile fabric (76.17 square...
- Letcher County Fiscal Court is requesting bids for culvert repair and rip rap installation across multiple sites in Letcher County, Kentucky, with bids due July 9, 2026 at 9:00 a.m. EST and award anticipated at a Fiscal Court meeting on July 10 at 10:00 a.m. The scope includes cleaning and unclogging culverts ranging from 12 to 36 inches in diameter at locations on Sergeant Road, Seco Drive, Spirit Drive, and Shelby Fork — approximately 151 linear feet of 12-inch culvert cleaning, 28 linear feet...
- Letcher County Fiscal Court is requesting bids for shoulder repair work on Kelly Drive and Cinnamon Lane, with bids due July 9, 2026 at 9:00 a.m. EST and bid opening at 10:00 a.m. the same day at the Letcher County Judge Executive's Office in Whitesburg, Kentucky. Award is scheduled for July 10, 2026 at a special fiscal court meeting. The scope includes installation of geotextile fabric (approximately 165.97 square yards), Class II channel lining (114.59 tons), and DGA road base (18.68 tons)...
- Letcher County Fiscal Court is requesting bids for culvert and shoulder repair on Abbey Road and Buck Creek across seven sites, with bids due July 9, 2026 at 9:00 a.m. EST and bid opening at 10:00 a.m. the same day. Contractors with overdue work for the county are ineligible to bid. The scope includes installation of geotextile fabric (134.78 square yards total), Class II Channel Lining (72.83 tons total), and DGA road base (10.56 tons total), cleaning and unclogging of culverts ranging from 8...
- Letcher County Fiscal Court is requesting bids for shoulder repair and rip rap work on Cane Branch using best construction practices, with bids due July 9, 2026 at 9:00 a.m. EST. All bids and required supporting documents must be submitted online. The scope encompasses shoulder repair and rip rap installation on Cane Branch. The full RFB document contains project specifications, quantities, and technical requirements; the source summary does not itemize these details. Site visit requirements and...
- Letcher County Fiscal Court is requesting bids for shoulder repair and rip rap work under Contract 4663, Group 4, with bids due July 9, 2026 at 9:00 a.m. EST. The scope encompasses rail and cribbing repair activities using best construction practices. All bids and required documentation must be submitted online. The full RFB document, attached as "1-4663 Letcher County 736027 Rail Cribbing Group 4 Shoulder Repair R2 RFB Final Due 7.9.26.pdf," contains specific details on site visits,...
- Letcher County Fiscal Court is requesting bids for road repairs through rail and cribbing embankment stabilization work, with bids due July 15, 2026 at 2:00 PM EST via the DFS Procurement Portal at dfs.bonfirehub.com. The procurement encompasses all remaining rail and cribbing work to address embankment erosion and stabilization, with all work to be contracted and completed by June 30, 2027. Bidders must use the designated bid form and submit through the portal; proposals received after the...
Letcher County Fiscal Court is requesting bids for shoulder repair and rip rap installation work across ten sites in Letcher County, Kentucky (four on Old Dixon Road and six in the Oasis Fork area), with bids due July 9, 2026 at 9:00 a.m. EST through the DFS Procurement Portal. This project is funded through a FEMA grant, requiring detailed documentation of quantities and materials to match grant specifications. The scope includes installation of geotextile fabric (138.77 square yards), Class II and Class III channel lining (40.85 tons and 106.70 tons respectively), and Dense Grade Aggregate base material (17.36 tons), along with removal of temporary rip rap at one location. Mobilization and traffic control are a lump sum item. Unit pricing must be all-inclusive of labor, equipment, materials, and supplies with no increases permitted except for county-approved changes. All work must conform to Division 400 of the Kentucky Department of Highways 2019 Standard Specifications for Road and Bridge Construction. Work must be completed by July 29, 2026. Bids will open on July 9, 2026 at 10:00 a.m. EST at the Letcher County Judge Executive's Office in Whitesburg, with contract award scheduled for July 10, 2026 at 10:00 a.m. EST. Payment is contingent upon work completion, receipt and reconciliation of all documentation by the Grants Management Team, and Fiscal Court approval. Before commencing work, the contractor must contact Matt Amburgey at (606) 595-8710 to schedule supervision and inspection. Required submissions include copies of insurance, a drug-free workplace policy, and eight certification forms addressing non-collusion, lobbying, debarment status, conflict of interest, and affirmative steps for small and minority business participation. Contractors with overdue county work are ineligible for additional projects until completion. Invoices require extensive documentation including before and after photographs with GPS coordinates and dates, quarry location documentation for aggregate materials, and proof of proper disposal of debris and spoils.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
1-4663 Letcher County 742929 Rip Rap Group 30 R2 RFB Final Due 7.9.26.pdf | 3MB | 6/30/26 |