2897-22 Scholls Heights at South Cooper Mountain Phase NE Non-Potable Waterline
Closed State & local contract opportunity Posted
- Solicitation number
- S-KB0020-00000295
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- UNSPSC codes
- 30111510 Pipeline protection concrete mattress
- 72121505 Waste water and sewage treatment plant construction service
- 40175401 Pipe stoppers
- 78101718 Offshore supply vessel service
- 95121810 Irrigation and flood control waterworks
- 40175400 Pipe support
- 20121459 Wireline entry guide
- 20123206 Swellable packer
- 20143305 Pig signalers
- 40175402 Pipeline launch/receive traps
Show all 24
- 40175403 Quick opening closures
- 40175404 Pipeline support bags
- 40175405 Spring hanger
- 40175406 Pipe support hangers
- 40175408 Pipeline inflatable spheres
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- 72151100 Plumbing construction services
- 20143304 Intelligent pigs
- 40175407 Pipeline spheres
- 95121811 Aquaduct or other water supply conduit, except pipeline
- Point of contact
-
- Terry Muralt tmuralt@beavertonoregon.gov
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The City of Beaverton, Oregon is soliciting bids for the Scholls Heights at South Cooper Mountain Phase NE Non-Potable Waterline project (Solicitation #3827-22B), which involves installing approximately 5,336 linear feet of 2" diameter, 1,513 linear feet of 6" diameter, and 175 linear feet of 10" diameter new non-potable water main with associated appurtenances. The procurement is a public works construction contract covering infrastructure development within Washington County and Barlow City jurisdictions. Electronic bids must be submitted by 2 p.m. on August 12, 2021, with First-tier Subcontractor Disclosure Forms due by 4 p.m. the same day. A non-mandatory pre-bid conference will be conducted via Microsoft Teams on August 3, 2021, at 10 a.m. Bidders are required to register an account with the City of Beaverton and subscribe to the bid on the city's website to obtain project plans and specifications. The project is partially funded through federal Water Infrastructure Finance and Innovation Act (WIFIA) funds, which introduces additional compliance requirements.
The contract is subject to state prevailing wage rates and the federal Davis-Bacon Act, mandating that bidders agree to comply with wage provisions under ORS 279C.838, ORS 279C.840, or 40 U.S.C. 3141 to 3148. While no specific set-aside designations are mentioned, contractors must adhere to federal and state labor regulations. The estimated project cost ranges between $530,000 and $570,000, indicating a moderate-sized infrastructure investment. Bidders will need to demonstrate compliance with prevailing wage standards, have appropriate licensing and technical capabilities for municipal water infrastructure installation, and show capacity to work with federally funded project requirements. The procurement does not specify restrictions on organization types, but federal funding typically encourages broad participation while maintaining strict qualification standards. Prospective bidders should carefully review all documentation and ensure they can meet the technical, legal, and financial requirements of this water infrastructure project.
Opportunity text
Bidders may obtain plans and specifications for the project by visiting the Citys website at http://apps2.BeavertonOregon.gov/Bids/ after registering an account with the City and subscribing to the bid.