27-014 Conduit & Wire Installation Phase 4
Closed State & local contract opportunity Posted
- Solicitation number
- PE-64750-NONST-2027-000000215
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- 31151702 Non electric control cables
- 31151703 Lifting cables
- 31151704 Track cables
- 31151707 Non electrical aluminum cables
- 31151806 Laminated wire
- 31151706 Non electrical copper cables
- 31151710 Synthetic cable
- 31151705 Non electrical steel cables
- 31151803 Piano steel wire
- 31151805 Strand or multi filament wire
- Point of contact
-
- Joshua Williams jswilliams@albanyga.gov (229) 431-3211
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Albany, Georgia Procurement Division is requesting sealed bids for installation of 1–2 inch HDPE primary power conduit between transformers via directional bore method, with bids due September 8, 2026 at 2:30 p.m.
The scope requires all labor and equipment to install underground conduit at a minimum depth of 3.5 feet, following provided drawings. Installation method is directional bore. Bids must be submitted in sealed form to the Procurement Division at 222 Pine Avenue, Suite 260, Albany, Georgia 31701.
The available bidding documents do not specify estimated contract value, contract term, place of performance beyond the submission address, set-asides or preference programs, incumbent contractor, evaluation criteria, or a pre-bid meeting date. Interested bidders should request the complete scope of work document and bid packet from the City of Albany Procurement Division to obtain technical specifications, bonding and insurance requirements, payment schedules, and other material contract terms.
Opportunity text
Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite 260, Albany, Georgia 31701, until 2:30 p.m. on September 08, 2026, from a contractor to provide all labor and equipment necessary to install 1-2 inch HDPE primary power conduit between transformers via directional bore method as shown on provided drawings at a minimum depth of 3.5 ft.
Files
| File | Type | Posted |
|---|---|---|
| 27_014 Conduit and Wire Installation Phase 4 .pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity