26-031 removal & installation of (2) 750 GPM vertical turbine pumps morgan dairy pump station

Closed State & local contract opportunity Posted

Solicitation number
PE-65700-NONST-2026-000000103
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 50
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Floyd County Board of Commissioners Purchasing Department is requesting bids for removal and installation of two 750 GPM vertical turbine pumps at the Morgan Dairy Road Pump Station in Cave Spring, Georgia, under Bid #26-031, with sealed bids due September 21, 2026 at 11:30 a.m. and a mandatory pre-bid and site visit on September 2, 2026 at 10:00 a.m.

The scope includes removal of the existing pump system and installation of two Grundfos 750 GPM vertical pumps with motors, two Variable Frequency Drives in prewired cabinets, two disconnects, and one 600-amp panel (all provided by Floyd County). The contractor must coordinate Georgia Power outages, obtain necessary permits and inspections, reconfigure piping, perform any required concrete demolition, install mounting pads, pull wiring to the SCADA box for system integration, and specify a reasonable timeline minimizing downtime. The site visit includes visits to both the Morgan Dairy Road location (151 Morgan Dairy Road, Cave Spring, GA 30224) and Burnett Ferry Road Pumpstation (2308 Burnett Ferry Road, Rome, GA 30165).

Floyd County will award on a lump-sum or individual-item basis, whichever is in the County's best interest, to the responsible bidder whose bid is most advantageous considering price and other factors. No bonds are required. The successful bidder must furnish a Certificate of Liability Insurance of at least $500,000 per occurrence within ten calendar days of award notification. Liquidated damages are assessed at $750 per day for failure to meet specified start and completion dates. Payment terms are Net 30. All bids must remain open for ninety days following opening and may not be withdrawn during this period. Bidders must comply with Georgia Security and Immigration Compliance Act requirements, including E-Verify authorization. Questions are due September 14, 2026 at 5:00 p.m. Bid tabulations will be posted within 24 hours of opening.

Opportunity text

The Floyd County Board of Commissioners will be receiving bids from contractors through the Purchasing Department of Floyd County Georgia for the purpose of the removal and installation of (2) 750 GPM Vertical Turbine Pumps at the Morgan Dairy Road Pump Station.

Files

File Type Posted
26_031 REMOVAL _ INSTALLATION OF (2) 750 GPM .pdf PDF
BID PRICE SUBMISSION FORM.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors