26-025 removal & installation of (2) 500 GPM vertical turbine pumps burnett ferry road pump station
Closed State & local contract opportunity Posted
- Solicitation number
- PE-65700-NONST-2026-000000102
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 40151570 Mixed flow pump
- 40151724 Dosing pump spare parts
- 40151581 Multi stage pump
- 40151568 Pulp pump
- 40151573 Magnet pump
- 40151515 Solenoid pumps
- 40151528 Oscillating pumps
- 40151550 Duplex pumps
- 40151551 Gear pumps
- 40151740 Pump spare parts and accessories
Show all 50
- 40151510 Water pumps
- 12163000 Mud removal mixtures
- 40151700 Pump parts and accessories
- 20121109 Cement pumping units
- 20121207 Fracturing pumping units
- 40151505 Dosing pumps
- 40151508 Mud pumps
- 40151509 Reciprocating pumps
- 40151516 Shear pumps
- 40151518 Sealless pumps
- 40151519 Sanitary pumps
- 40151522 Reverse osmosis pumps
- 40151530 Dredge pumps
- 40151554 Ram pumps
- 40151559 Simplex pumps
- 40151560 Sliding vane pumps
- 40151561 Triplex pumps
- 40151567 High temperature pump
- 40151571 Inline pump
- 40151577 Grouting pump
- 40151578 Diving air pump
- 40151579 Gravity pump
- 20121003 Acidizing pumping units
- 40151575 Brushless coolant pump
- 40151546 Axial split pumps
- 40151582 Treadle pump
- 40151580 Lubricator pump
- 40151534 Cryogenic pumps
- 40151569 Monoflex pump
- 40151531 Dewatering pumps
- 40151514 Steam pumps
- 40151558 Screw Pumps
- 40151572 Air lift pump
- 40151588 Industrial pumps
- 40151565 Macerator pump
- 40151576 Mortar pump
- 40151728 Pump repair kits
- 40151562 Worm pumps
- 40151574 Ejector pump
- 40151721 Water pump spare parts
- Point of contact
-
- Randy E. Self randy.self@floydcountyga.org (706) 291-5118
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Floyd County Board of Commissioners Purchasing Department is soliciting bids for removal and installation of two 500 GPM Vertical Turbine Pumps at the Burnett Ferry Road Pump Station, with sealed bids due September 21, 2026 at 11:00 a.m. and a mandatory pre-bid and site visit on September 2, 2026 at 10:00 a.m.
The scope includes removing the existing pump system and installing new pumps, motors, two Variable Frequency Drives in separate cabinets, power panel drives, and disconnect switches; coordinating with Georgia Power; and tying into the existing SCADA system. Floyd County will supply the pumps, motors, VFDs, disconnect switches, and 400-amp panel. The contractor must provide all other materials necessary for installation, including piping changes and electrical work, and must obtain all required permits and licenses. The contractor bears responsibility for establishing a reasonable and strictly adhered-to downtime timeline, as the County cannot sustain extended service interruptions.
The contract will be awarded on a lump-sum or individual-item basis to the responsible bidder whose bid best serves the County's needs. Payment will be made within 30 days of invoice receipt and approval upon completion and County acceptance of work. Bids are due on a Net 30 payment-terms basis and are considered maximum prices not subject to increases due to taxes, shipping, handling, or any other cause.
The contractor must submit a Certificate of Liability Insurance of at least $500,000 per occurrence within 10 calendar days of award notification. No bonds are required. The contractor must comply with the Georgia Security and Immigration Compliance Act and submit certifications including Contractor Affidavit for E-Verify compliance (if ten or more employees), S.A.V.E. Compliance (if ten or fewer employees), Certificate of Non-Discrimination, Certificate of Non-Collusion, and Drug-Free Workplace Certificate. Questions are due September 14, 2026 at 5:00 p.m., and the final addenda deadline is September 17, 2026 at 12:00 p.m. Bid tabulations will be posted within 24 hours of opening. All documents must be submitted electronically through https://floydcountyga.bonfirehub.com. The County reserves the right to delay award for up to 90 days.
Opportunity text
The Floyd County Board of Commissioners will be receiving bids from contractors through the Purchasing Department of Floyd County Georgia for the purpose of the removal and installation of (2) 500 GPM Vertical Turbine Pumps - Burnett Ferry Road Pump Station.
Files
| File | Type | Posted |
|---|---|---|
| 26_025 REMOVAL _ INSTALLATION OF (2) 500 GPM .pdf | ||
| BID PRICE SUBMISSION FORM.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity