25-003 4787 Riverview Road Drainage Improvement Project

Closed State & local contract opportunity Posted

Solicitation number
PE-66098-NONST-2025-000000050
State
Georgia
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Paragraph 1:

This is an Invitation to Bid (ITB) for the 4787 Riverview Road Drainage Improvement Project in Fulton County, Georgia. The project entails repairing a 132-foot culvert by centrifugally casting a concrete liner within the existing pipe, replacing two catch basins and 39 linear feet of pipe, and installing a new concrete headwall. Additionally, the project includes 27 square yards of black integral colored concrete, riprap energy dissipation, and dewatering via bypass pumping. The work must be coordinated with the National Park Service and the City of Sandy Springs, as well as with Atlanta Gas Light. Bids are due on August 13, 2024 at 2:00 PM EST, and a mandatory pre-bid conference will be held on July 22, 2024 at 9:30 AM EST at the project site. The contract term is 120 calendar days from the notice to proceed.

Paragraph 2:

The procurement is open to any qualified contractor registered in the State of Georgia. The contractor must comply with the Georgia Security and Immigration Compliance Act and provide the required bonds, insurance, and certifications. The City of Sandy Springs reserves the right to reject any or all bids and will award the contract based on the best interest of the City. No specific set-aside designations or restrictions on the types of organizations that can respond have been identified. The budget range or possible award value for this project has not been provided in the available information.

Opportunity text

The project includes the repair of a 132-foot culvert by centrifugally cast lining the pipe while also replacing two catch basins, 39 linear feet of pipe, and a concrete headwall located at 4787 Riverview Road in Sandy Springs, Georgia. The project also includes installing 27 square yards of 10¿ black integral colored concrete, rip rap energy dissipation at the outfall of the headwall, and de-watering by means of bypass pumping through the existing culvert. All work shall be coordinated with the National Park Service and the City of Sandy Springs as well as with Atlanta Gas Light prior to conducting work.

Files

File Type Posted
CENTRIFUGALLY CAST CONCRETE PIPE SPECIFICATIO.pdf PDF
ITB 25_003.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity