24-Inch Waterline Along Highway 3 From Fuqua Street to Dixie Farm Road (FM 1959)

Open State & local contract opportunity Posted

Solicitation number
CSP-2026-0010
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Houston is soliciting proposals from qualified proposers for construction of a 24-inch diameter water distribution line along State Highway 3 from Fuqua Street to Dixie Farm Road (FM 1959), with proposals due December 10, 2026.

The scope covers four segments: 8,287 linear feet of 24-inch line installed by open cut; 385 linear feet installed by open cut within 36-inch steel casing; 115 linear feet within 36-inch steel casing inside the limits of a Fault Hazard Zone; and 2,375 linear feet within 36-inch steel casing installed by trenchless construction. Place of performance is Harris County, Texas, and the opportunity was posted November 2, 2026.

Opportunity text

The City of Houston (City) seeks proposals from qualified Proposers to provide construction services for a 24-inch diameter water distribution line including 8,287 linear foot of 24-inch diameter water line by open-cut, 385 linear foot of 24-inch diameter water line in 36-inch diameter steel casing by open cut, 115 linear foot of 24-inch diameter water line in 36-inch diameter steel casing within limits of a Fault Hazard Zone, and 2,375 linear foot of 24-inch diameter water line in 36-inch diameter steel casing by trenchless construction along State Hwy 3 (SH 3) from Fuqua Street to Dixie Farm Road (FM 1959).

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors