2026023-RFQ2911 Engineering Services for PI# 0021741 CR-580/North Belair Widening Project
Closed State & local contract opportunity Posted
- Solicitation number
- 2026023-RFQ2911 Engineering Services for PI# 0021741 CR-580/North Belair Widening Project
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 925 Engineering Services, Professional
- 92513 Bridge Engineering
- 92517 Civil Engineering
- 92519 Concrete Engineering
- 92535 Environmental Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92546 Geotechnical Engineering
- 92549 Highways; Streets; Airport Pay-Parking Lots - Engineering
- 92593 Traffic And Transportation Engineering
- UNSPSC codes
- 81102501 Mine permitting service
- 81151906 Land geophysical acquisition
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81102202 Urban transport network
- 81102203 Inland waterways
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81101607 Textile engineering service
Show all 24
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 81151907 Marine geophysical acquisition
- 81101510 Highway engineering
- 81102200 Transportation engineering
- 81102201 Traffic engineering
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
- 81101514 Geotechnical or geoseismic engineering
Opportunity details come from columbiacountyga.bonfirehub.com. Updated .
About this opportunity
Columbia County, Georgia is requesting proposals for engineering services for the CR-580/North Belair Widening Project (PI# 0021741), with proposals due July 16, 2026. The selected consultant will deliver all project phases from concept development through final construction plans in compliance with current Georgia Department of Transportation policies and the Plan Development Process.
The scope encompasses widening approximately 2.4 miles of North Belair Road (CR 580) from two lanes to three lanes, extending from Evans to Locks Road to SR 28 (Fury's Ferry Road). The design will include one mainline travel lane in each direction, a continuous central turning lane, select right-turn deceleration lanes, a shared-use path for cyclists and pedestrians connecting the Fury's Ferry Road corridor to Evans Town Center, and associated infrastructure and safety upgrades at the CSX railroad crossing.
Deliverables include concept development, field surveys and database establishment, environmental documentation, public involvement support, preliminary construction plans, subsurface utility engineering (SUE), active utility coordination and relocation management under GDOT Chapter 14 compliance, right-of-way plans, and final construction plans. No estimated contract value, contract term, evaluation criteria, or pre-proposal meeting date is stated in the source.
Opportunity text
The proposed project (Columbia County PI 0021741) consists of widening an approximately 2.4-mile section of North Belair Road (CR 580) from two lanes to three lanes, extending from Evans to Locks Road to SR 28 (Fury's Ferry Road). To improve corridor-wide safety and operational efficiency, the project will feature one mainline travel lane in each direction, a continuous central turning lane, and select right-turn deceleration lanes designed to effectively separate turning movements from through traffic at high-volume side streets. A key component of this corridor modernization is the installation of a shared-use path, which will provide vital multimodal connectivity for cyclists and pedestrians between the Fury's Ferry Road (SR 28) corridor and Evans Town Center. The project scope also encompasses all associated infrastructure and safety upgrades at the CSX railroad crossing. The selected consultant will be responsible for delivering all project phases-including concept development, field surveys/database establishment, environmental documentation, public involvement support, preliminary construction plans, subsurface utility engineering (SUE), active utility coordination and relocation management (GDOT Chapter 14 compliance), right-of-way plans, and final construction plans-in strict accordance with current GDOT policies, guidelines, and the Plan Development Process (PDP).
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity