2026010-BID5100 Sawdust Road Water Line
Closed State & local contract opportunity Posted
- Solicitation number
- 2026010-BID5100 Sawdust Road Water Line
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 72141126 Underground utilities construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 72141123 Manhole construction service
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121800 Utility buildings and structures
Opportunity details come from columbiacountyga.bonfirehub.com. Updated .
About this opportunity
Coffee County, Georgia is procuring a general contractor to construct water distribution system additions through Invitation for Bid 2026010-BID5100, with proposals due by March 19, 2026. The project scope involves the installation of approximately 30,000 linear feet of 12-inch Ductile Iron Water Line and associated appurtenances, extending from the intersection of Harlem Grovetown Road and Old Louisville Road through Old Union Road and North Fairview Drive, terminating on Sawdust Road adjacent to an existing elevated water storage tank. The work encompasses 35 bid items and requires the contractor to furnish all equipment, tools, materials, and labor in strict conformance with contract documents and specifications. Key deliverables include the main water line installation with hydrants, gate valves, tapping sleeves, and bore-and-jack crossings at major roadways and utilities, as well as comprehensive erosion and sediment control measures across 14.3 acres of disturbed acreage, requiring a minimum of 958.1 cubic yards of sediment storage. Bidders must demonstrate a minimum of three similar projects completed within the last ten years, provide resumes and biographies for the proposed project manager and superintendent, and submit a comprehensive subcontractor listing with detailed responsibilities and work values. All bids must include a completed Statement of Qualifications, Non-Collusion Affidavit sworn and notarized, and Proposal Form, with incomplete submissions resulting in bidder disqualification. Partial payments will be made at 95 percent of incorporated labor and materials value with a maximum of 33 percent per payment, subject to a 5 percent retainage on total project value until final completion. Liquidated damages of $500 per calendar day will apply for failure to complete work within the specified time limit.
The procurement documents do not specify set-aside designations or restrictions limiting bidder eligibility based on disadvantaged enterprise status or organizational type. Contractors must comply with O.C.G.A. 13-10-91 and Georgia Department of Labor rules relating to the Georgia Security and Immigration Compliance Act of 2006, and must obtain a utility contractor license prior to bidding. The project includes coordination with multiple existing property owners along the route and the removal and abandonment of existing 6-inch and 8-inch water lines currently serving the area. The contractor will be responsible for all monitoring, inspection reporting, and sediment removal throughout the construction period until final stabilization is achieved, with work performance overseen by the Owner's Engineer and County. No specific budget or award value range is disclosed in the procurement documents. Final payment is contingent upon the contractor submitting evidence under oath that all payrolls and amounts due for labor, materials, and indebtedness have been paid.
Opportunity text
Bids for the complete work in one general contract shall be made on the electronic forms provided for all materials, equipment and labor for the construction of: Water Distribution System additions of 30,000' of 12" Ductile Iron Water Line and associated appurtenances.
Files
| File | Type | Posted |
|---|---|---|
| 3-Statement of Qualifications.pdf | ||
| 4-Proposal Form.pdf | ||
| 1-SAWDUST ROAD -Project plans 02-10-26.pdf | ||
| 2-NONCOLLUSION AFFIDAVIT.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities