About this opportunity
The City of Ellenburg, Washington is soliciting bids on the 2026 Residential Sidewalk Repair Program, with proposals due June 2, 2026. The scope spans four schedules: Schedule A covers removal and reconstruction of residential sidewalk, curb, gutter, and pavement, including subgrade preparation, top-course placement and compaction, cement concrete curb and gutter construction, sidewalk and curb-ramp installation, and drive-approach and asphalt work. Schedule B addresses transit stop improvements. Schedules C and D cover street-related and utility-related concrete work for the City of Ellenburg, respectively, and are to be used on an as-needed basis throughout the contract year.
The awardee must furnish all labor, materials, equipment, and miscellaneous items required to complete work across all schedules. Detailed technical specifications and standards are provided in the specifications document (2026-022 Residential Sidewalk Repair Program Specs SIGNED.pdf, 16MB). The contract structure permits flexibility in scheduling and resource allocation to address residential and municipal infrastructure needs while maintaining compliance with local engineering and construction practices. No proposal-question deadline, pre-bid meeting, incumbent contractor, estimated contract value, or evaluation criteria are identified in the source.
Opportunity text
2 versions
Update #2 · Latest ·
The City of Mukilteo solicits interest from consulting firms with expertise in construction management. The proposed improvements include pedestrian walkways and bike lanes on 5th St. between Lincoln Ave and Mukilteo Ln within the City of Mukilteo. Specific work includes, but is not limited to: Construction of HMA walkways, HMA overlay, retaining walls, concrete barriers, drainage structures and piping, striping, luminaires, and traffic control. The voluntary Small Business Enterprise (SBE) goal is 10%.
Update #1 ·
The project consists of furnishing all labor, materials, equipment, and other misc items remove existing sidewalk, curb and gutter, pavement, subgrade; prep subgrade, place and compact top course, construct cement concrete curb, gutter, sidewalk; curb ramps, and drive approaches; install asphalt. Sced B requires the furnishing of all labor, materials, equipment, and other misc items for transit stop improvments. Sched C & D are the City of Ellenburgs street related concrete work and utility related concrete work, respectively, and shall be used throughout the year on an as-needed basis.