2025031-RFQ2911 PI # 0021250 SR-104/Washington Rd Widening Project Engineering Services

Closed State & local contract opportunity Posted

Solicitation number
2025031-RFQ2911 PI # 0021250 SR-104/Washington Rd Widening Project Engineering Services
State
Georgia
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 24

Opportunity details come from columbiacountyga.bonfirehub.com. Updated .

About this opportunity

The Puerto Rico government is seeking engineering services for the SR-104/Washington Road Widening Project (PI # 0021250) through a Request for Qualifications (RFQ) procurement process. The project involves widening an approximately 2.4-mile section of Washington Road from William Few Parkway to Tubman Road, expanding the roadway from two to four lanes with additional right-turn deceleration lanes. The comprehensive engineering services scope includes concept development, field surveys, database creation, environmental documentation, preliminary and final construction plans, right-of-way plans, and public involvement activities, all to be completed in accordance with Georgia Department of Transportation (GDOT) policies and guidelines. The solicitation was posted on July 30, 2025, with proposals due by August 28, 2025. Interested firms must carefully review the RFQ document (2-1 - Washington SR104 Rd GDOT RFQ Document.pdf) and submit comprehensive qualifications demonstrating technical expertise, project understanding, and capability to execute the complex roadway expansion project. The procurement appears to emphasize technical qualifications, past performance, and team capabilities as primary evaluation criteria.

While specific set-aside designations are not explicitly detailed in the provided documents, the solicitation includes a Non-Collusion Affidavit, suggesting standard competitive procurement protocols. The project appears to be open to qualified engineering firms with demonstrated transportation infrastructure design experience. An Addendum 1 document is included, which may contain additional clarifications or modifications to the original RFQ requirements. The roadway improvement project represents significant infrastructure investment, though precise budget or potential contract value is not specified in the available documentation. Prospective respondents will need to carefully review the technical specifications, demonstrate comprehensive engineering capabilities, and provide detailed qualifications that align with GDOT's rigorous standards for roadway design and construction planning. Firms interested in this opportunity should prepare comprehensive submissions that showcase their technical expertise, project management capabilities, and understanding of complex transportation infrastructure development.

Opportunity text

The Proposed project (Columbia County PI 0021250) will consist widening an approximately 2.4 mile section of Washington Rd (SR 104), from William Few Pkwy to Tubman Rd, from two-lanes to four-lanes. The four-lane section will consist of two mainline travel lanes in each direction and select right-turn decel lanes to serve side streets with high traffic volumes. The scope of work includes concept development, field surveys and database development, environmental documentation, preliminary construction plans, right-of-way plans, and final construction plans, all in accordance with GDOT policies and guidelines. The scope of the work also includes public involvement.

Files

File Type Posted
2-1 - Washington SR104 Rd GDOT RFQ Document.pdf PDF
1-2 - NONCOLLUSION AFFIDAVIT.docx DOCX document
3-Addendum 1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors