2025 RFP natural gas reliability upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- PE-75553-NONST-2025-000000030
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 30111510 Pipeline protection concrete mattress
- 72141126 Underground utilities construction service
- 40175401 Pipe stoppers
- 78101718 Offshore supply vessel service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 40175400 Pipe support
- 20121459 Wireline entry guide
- 20123206 Swellable packer
- 20143305 Pig signalers
Show all 26
- 40175402 Pipeline launch/receive traps
- 40175403 Quick opening closures
- 40175404 Pipeline support bags
- 40175405 Spring hanger
- 40175406 Pipe support hangers
- 40175408 Pipeline inflatable spheres
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 20143304 Intelligent pigs
- 40175407 Pipeline spheres
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The state of Georgia, specifically Ware County, is seeking proposals for a natural gas reliability upgrade project through RFP #67728789d3284f53af024f18, with responses due by February 11, 2025. The contract will be signed approximately February 24, 2025, with an official start date of March 3, 2025, and will continue through December 31, 2025. Dalton Utilities is soliciting a contractor to perform comprehensive gas distribution system improvements, including construction of gas mains using steel and HDPE materials, installation of gas services through threaded and welded meter set builds, and related distribution work. The selected contractor must provide forty hours of labor per week, excluding holidays and inclement weather, and will be responsible for providing all necessary equipment and tools to complete the project. Critical performance requirements include comprehensive testing of all installed lines for leaks and immediate repair if pressurization reveals any deficiencies, with all work to be completed according to Dalton Utilities' specific technical specifications.
While the contract documentation does not explicitly specify set-aside designations or contractor restrictions, the technical complexity of the project suggests that respondents will need demonstrated expertise in natural gas infrastructure construction and distribution systems. The project appears to be a standard procurement without specified minority or disadvantaged business enterprise requirements. No incumbent vendor information is provided in the available documentation. The contract duration of approximately ten months indicates a substantial infrastructure improvement initiative, though specific budget ranges or total project value are not disclosed in the current solicitation. Prospective contractors will need to demonstrate comprehensive capabilities in gas main construction, service line installation, technical testing protocols, and adherence to utility-specific technical standards to be considered for this contract opportunity.
Opportunity text
The project will consist of, but is not limited to, a contract that will be signed on or about, Monday, February 24, 2025 after the bids have been reviewed and evaluated. Official contract start date will be Monday, March 3, 2025 and will continue through December 31, 2025. Work will include forty (40) hours a week labor, excluding holidays and inclement weather. Contractor will be responsible for having equipment and tools required for the construction of gas mains (both Steel and HDPE), gas services (both threaded and welded meter set builds), and performing other distribution work related to the improvement of Dalton Utilities¿ natural gas distribution system per Dalton Utilities specifications. All sites must be tested for leaks and repaired if necessary after pressurizing line.