2022 blow-off replacements

Awarded State & local contract opportunity Posted

Solicitation number
MDJ-8018
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

Cobb County-Marietta Water Authority is soliciting bids for replacement of water-main blow-off assemblies and related valve components on the Cobb County Water System, with bids due October 5, 2021, and only contractors pre-qualified to construct ductile iron water mains of 36-inch diameter and larger (Categories 2, 3, and 4) at the time of first publication eligible to bid.

The work includes replacement of seven existing 8-inch and/or 12-inch saddle blow-offs on 48-inch and/or 42-inch water mains with corresponding Tees and blow-offs; removal of one 8-inch saddle blow-off; replacement of two 42-inch butterfly valves with 42-inch gate valves; replacement of one 6-inch air/vacuum valve assembly; and replacement of two 12-inch outlets. Engineering Strategies, Inc. is the project engineer. Bids will be publicly opened and read aloud; late submissions will not be considered. Bid opening time is subject to extension under O.C.G.A. Section 36-91-20(d). Bidders must comply with all applicable Georgia laws and regulations.

Opportunity text

The Bids will be publicly opened and read aloud. Bids received after the designated time will not be considered. The Owner of the project is Cobb County-Marietta Water Authority. The Engineer for the Project is Engineering Strategies, Inc. Bid opening time is subject to extension pursuant to O.C.G.A Section 36-91-20(d). Only those contractors that are pre-qualified with the Cobb County-Marietta Water Authority to construct ductile iron water mains of 36-inch and larger diameter (Categories 2, 3, and 4) at the time of the first publication of this notice will be allowed to bid this project. The approximate extent and character of the Work is generally described as follows: Replacement of seven existing 8-inch and/or 12-inch saddle blow-offs on 48-inch and/or 42-inch water main with 48-inch or 42-inch x 12-inch or 8-inch Tees and 12-inch or 8-inch blow-offs; removal of one 8-inch saddle blow-off, replacement of two 42-inch butterfly valves with 42-inch gate valves, replacement of one 6-inch A/V valve assembly and replacement of two 12-inch outlets to the Cobb County Water System. Bidders shall inform themselves concerning Georgia Laws and comply with same. Please see attachment for more details.

Files

File Type Posted
Award Information —
2022 Blow Off Replacement —

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity