1400 Henrietta Avenue Project

Closed State & local contract opportunity Posted

Solicitation number
26-19-FIRE SPRINKLER SYSTЕM
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

West Palm Beach Housing Authority (WPBHA) is soliciting proposals for shell and site work on the 1400 Henrietta Avenue Project in West Palm Beach, Florida, with responses due November 16, 2026. The source does not qualify the opportunity with a set-aside, preference, or mandatory vehicle.

The site work covers lot and pad grading to elevations per the site plan, clean fill as needed, and removal of excavated dirt and rock not reused as backfill. The contractor must perform all compaction with reports delivered to WPBHA and must clear the site of concrete and construction debris at completion, grading to approved plans for positive drainage. The shell work includes excavating footers, forming and positioning slabs, filling pads to finished-floor, porch, and walkway elevations, completing form board surveys coordinated with WPBHA, and installing a vapor barrier. The contractor must also provide pest control soil treatments approved under the Florida Building Code and West Palm Beach building department standards, with initial and final certifications submitted to WPBHA. The shell scope includes stairs, decorative and hand railings, balcony railings, and exterior and interior shell features for all residential buildings and the clubhouse. The contractor must install windows, screens, and exterior doors. Underground plumbing and electrical are handled by other trades, and the shell contractor coordinates with them.

The shell contractor must provide and pay for a dumpster for the full duration of shell work, supply its own electrical and water for construction, and remove worker materials and trash daily. The subcontractor must coordinate all City of West Palm Beach inspections and have a representative present at each one.

Grading and survey documents are provided with the solicitation, and the full package, including the scope document, sits in a 77MB public file share posted November 7, 2026.

Opportunity text

Site work Lot grading and pad grading to proper elevation per site plan grades Provide clean fill as needed Remove and dispose of all dirt, and rock substrate that is excavated in order to create channels for footings that is not needed to fill back in once concrete form is poured Perform all required compaction for lot and pad and provide copies of reports to WPBHA At completion of shell work, site is to be cleared of all concrete and construction debris and graded in accordance with survey and approved grading plans (provided), assuring specified grades for positive drainage providing a finished grade. Pass all required City of West Palm Beach inspections Shell contractor shall provide a dumpster onsite and shall pay for cost of dumpster for the entire duration of the shell work. Shell contractor shall provide all electrical and water required for their onsite construction. Shell contractor shall remove all materials, debris and any trash associated with their workers from the site daily. Subcontractor shall coordinate all inspections and have a representative present during any and all inspections relating to the permitted work. Shell shall include all stairs, decorative and hand, and balcony railings, and exterior/ interior features associated with the shell on the plans. All shell work shall include all residential buildings and the clubhouse Subcontractor to provide and install all windows, screens, and doors (Exterior) Formwork Perform all necessary pad prep Excavate footers Form and position slab correctly according to plans and survey Fill pads to proper elevations (FF, porches walkways) Complete all required form board surveys (surveyor and surveys provided by shell contractor and coordinated with WPBHA Surveys) Provide FBC & WPB building department approved pest control soil treatments and submit certificates to WPBHA including initial and final certifications Provide and install vapor barrier Plumbing and electrical underground by other (coordinate with WPBHA/contractor. However Shell contractor must ensure that drainlines/conduit are installed in slab per plans) Provide and install all rebar and structural steel (including slab wire mesh) per fl. Building code Provide and place all concrete for monolithic footer and 4" slab in a continuous pour on vapor barrier and WWF compliant with ASTM a185. Any alternative must be approved by the Building Contractor and Architect. Allsmooth finish concrete work for slab and premium finish level for walkways and catwalks and stairs Form and install all stairs and float all concrete Remove all form boards All slump testing shall be done by shell contractor and any costs including lab reports are shell contractors responsibility. Pass all WPB inspections Walls, beams, columns and lintels Purchase and install/lay all concrete block (CMU) Form all columns, beams, bond beams Provide and install all lintels Provide correct window and door openings in accordance with approved window and door shop drawings Provide and pump all columns, beams, bond beams Provide and install any structural steel posts or columns Make sure all door and window openings are or according to approved products and shop drawings Provide and install all embedded truss anchors, buckets and truss straps per plans and specs and/or according to code Pass all City of WPB inspections Subcontractor shall clean all dropped and dripped materials and concrete off of wall and floor areas Shell contractor to provide and install all stairs, railings and decorative appurtances associated with the buildings Shell contractor to install all necessary chases, boxes, attic hatches, etc to for example, contain piping for sprinkler systems, HVAC, Electric, and any related others. Roof truss and sheathing installation Trusses shall be provided by shell contractor Provide crane Install trusses in accordance with the approved permit documents and architect/engineer approved shop drawings for truss engineering and according to Florida building code. Strap trusses according to approved plans and approved truss engineering shop drawings Provide and install all truss wood, rat runs, x bracing, horizontal and vertical bracing, nailers and blocking Provide and install all roof sheathing according to plans and specs and code Pass all City of WPB inspections Outlookers and exterior specialty features including columns, decorative features, railings etc. Install products according to plans and approved shop drawings Window and exterior door installation Install window bucks and pass buck inspections Purchase, transport, store, and install all windows and all exterior doors Install and provide hurricane impact windows according to plans and specs Provide and install all doors and window screens and hardware for exterior doors including but not limited to locks, deadbolts, cranks, etc. Install and provided exterior doors to code Caulk all doors and windows Install all door thresholds Pass all City of WPB inspections

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors