Solar and Wind Interconnection for Future Transmission (SWIFTR)
Closed Posted
- Opportunity number
- DE-FOA-0003246
- Agency
-
Office of Energy Efficiency and Renewable Energy
Department of Energy
- Applications due
- Award size
- $1,000,000 to $2,500,000
Opportunity facts
- Assistance listings
- Funding instrument
- Cooperative Agreement
- Category
-
- Energy
- Eligible applicants
-
- Unrestricted
- Full announcement
Opportunity details come from Grants.gov. Updated .
About this opportunity
The U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO) and Wind Energy Technologies Office (WETO) are jointly issuing this Funding Opportunity Announcement (FOA) as part of their Interconnection Innovation Exchange (i2X) program. The FOA seeks innovative projects to enable simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of the electrical grid. The two topic areas are: 1) Improving the efficiency of electromagnetic transient (EMT) simulations for interconnection studies of inverter-based resources (IBRs), and 2) Developing tools to provide stakeholders with data on transmission system characteristics related to stability, voltage, and grid strength. Concept Papers are due on 4/17/2024, and Full Applications are due on 7/11/2024, with award notifications expected by 10/1/2024 and award negotiations from October to December 2024.
This FOA is funded under the Renewable Energy Research and Development program (CFDA 81.087), which supports the development and transfer of various renewable energy technologies to the non-federal sector. While the FOA does not specify award values or budget ranges, projects are expected to focus on improving software tools, engineering workflows, and guidelines for conducting EMT studies, as well as establishing data requirements, developing assessment tools, and testing them on real transmission systems.
Synopsis
2 versions
Update #2 · Latest ·
Modification 000001: Submission deadline for full applications has been moved from 6/28 to 7/11. Deadline for replies to reviewer comments has been moved accordingly to 8/16. Expected date for selection notifications has been moved to 10/1 and timeframe for negotiations has been moved to October-December 2024. - This Funding Opportunity Announcement (FOA) is jointly issued by the U.S. Department of Energy Solar Energy Technologies Office (SETO) and Wind Energy Technologies Office (WETO) as part of their Interconnection Innovation Exchange (i2X) program1 to support innovative work to enable simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electrical grid. The two FOA topic areas are as follows: Topic Area 1: Improved Efficiency of EMT Simulations for Interconnection Studies of IBRs Projects in this topic area will seek to improve the efficiency of the interconnection study process for new IBRs, such as solar and wind plants and battery energy storage systems, by improving software tools to study plant dynamics to increase long-term plant reliability. Projects will achieve this both by improving the speed of advanced, high-fidelity EMT modeling and simulation tools used in power systems interconnection studies and by developing a better understanding of when such high-fidelity simulations are necessary in the interconnection process. Topic Area 2: Dynamic Stability-Enhanced Network Assessment Tools Projects in this topic area will develop tools to provide stakeholders with data on transmission system characteristics related to stability, voltage, and grid strength while securing confidential and critical energy infrastructure information. Projects will establish the type of information required by stakeholders, develop a tool or tools, and test and evaluate those tools on at least one real transmission system. Topic Area 1 is primarily focused on the improvement of software tools, methods, or processes used to conduct EMT studies, the results of which will inform the transmission system interconnection stakeholders in Topic Area 2. Projects in Topic Area 2 do not need to be focused solely on transmission system characteristics based on EMT studies.
Update #1 ·
This Funding Opportunity Announcement (FOA) is jointly issued by the U.S. Department of Energy Solar Energy Technologies Office (SETO) and Wind Energy Technologies Office (WETO) as part of their Interconnection Innovation Exchange (i2X) program1 to support innovative work to enable simpler, faster, and fairer interconnection of clean energy resources while enhancing the reliability, resiliency, and security of our electrical grid. The two FOA topic areas are as follows: Topic Area 1: Improved Efficiency of EMT Simulations for Interconnection Studies of IBRs Projects in this topic area will seek to improve the efficiency of the interconnection study process for new IBRs, such as solar and wind plants and battery energy storage systems, by improving software tools to study plant dynamics to increase long-term plant reliability. Projects will achieve this both by improving the speed of advanced, high-fidelity EMT modeling and simulation tools used in power systems interconnection studies and by developing a better understanding of when such high-fidelity simulations are necessary in the interconnection process. Topic Area 2: Dynamic Stability-Enhanced Network Assessment Tools Projects in this topic area will develop tools to provide stakeholders with data on transmission system characteristics related to stability, voltage, and grid strength while securing confidential and critical energy infrastructure information. Projects will establish the type of information required by stakeholders, develop a tool or tools, and test and evaluate those tools on at least one real transmission system. Topic Area 1 is primarily focused on the improvement of software tools, methods, or processes used to conduct EMT studies, the results of which will inform the transmission system interconnection stakeholders in Topic Area 2. Projects in Topic Area 2 do not need to be focused solely on transmission system characteristics based on EMT studies.
Files
| File | Type | Posted |
|---|---|---|
| i2X SWIFTR FOA 3246.000001.pdf | ||
| FundOpp_DE-FOA-0003246.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar grant opportunities
- Ask GovTribe AI about this opportunity