Ecosystem and Natural Resource Range Study at Fort Stewart/Hunter Army Airfield, Georgia
Closed Posted
- Opportunity number
- W9126G262SOI8766
- Agency
-
ENDIST Fort Worth
US Army Corps of Engineers, Department of Defense
- Applications due
- Award size
- $483,567 to $2,468,658
Opportunity facts
- Assistance listings
- Funding instrument
- Cooperative Agreement
- Category
-
- Science and Technology and other Research and Development
- Eligible applicants
-
- Other
Opportunity details come from Grants.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Fort Worth District, is soliciting a Statement of Interest (SOI) from qualified Cooperative Ecosystem Studies Unit (CESU) members for a cooperative agreement to conduct an Ecosystem and Natural Resource Range Study at Fort Stewart/Hunter Army Airfield, Georgia. The primary products and services being procured include technical assistance for habitat management and land reconfiguration, encompassing forestry management, wiregrass seed harvesting (1,500 lbs.) and planting (150 acres), Red-cockaded woodpecker cavity tree protection (1,000 trees), erosion mitigation, and GIS support for geospatial data management and analysis. Applicants must demonstrate the Principal Investigator has at least five years of experience in natural resource management, habitat management, endangered species management, and ecosystem restoration, with additional staff meeting specific experience and educational requirements in heavy equipment operation and GIS coordination. The Statement of Interest, limited to two pages, is due by May 8, 2026, at 2:00 P.M. Central Time, with a 30-calendar-day review timeline from the April 8, 2026 posting date. All personnel must obtain security clearances, Common Access Cards (CAC), and complete required training including iWatch, Anti-Terrorism Level 1, OPSEC Level 1, and Information Assurance awareness training. Questions should be directed to Nicholas A. Aprea (Grants Specialist) or Joshua C. Wurtz (Project Manager) at the USACE Fort Worth District.
The base funding for this cooperative agreement is approximately $483,567 for an initial 12-month performance period, with potential for up to four additional 12-month follow-on option periods based on funding availability, providing a potential five-year engagement. The established CESU indirect rate is 17.5%, and all eligible recipients and subrecipients must have an active NIST SP 800-171 Department of Defense assessment completed within the last three years. Performance will take place at Fort Stewart/Hunter Army Airfield, Georgia, where the government will furnish extensive equipment including heavy machinery, vehicles, computers, software, and field supplies as detailed in the Statement of Objectives.
Synopsis
1) Note: A full study proposal and proposed budget are NOT requested at this time.
2) Project Title: Ecosystem and Natural Resource Range Study at Fort Stewart/Hunter Army Airfield, Georgia.
3) Brief Description of Anticipated Work: SEE ATTACTHED SOO FOR THIS INFORMATION.
4) Period of Performance: The Base period of the agreement will extend 12 months from the date of award. There may be up to four 12-month follow-on periods based on availability of funding.
5) Please send responses or direct questions to:
Nicholas A. Aprea
Grants Specialist
USACE, Fort Worth District
Email: Nicholas.a.aprea@usace.army.mil
AND
Joshua C. Wurtz
Project Manager
USACE, Fort Worth District
Email: joshua.c.wurtz@usace.army.mil
6) Timeline for Review of Statements of Interest: 30 calendar days from date posted.
Files
| File | Type | Posted |
|---|---|---|
| B01-RSOI W9126G262SOI8766.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar grant opportunities
- Ask GovTribe AI about this opportunity